My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 06202023
Roseville
>
City Council
>
City Council Meeting Packets
>
2023
>
CCP 06202023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 3:12:33 PM
Creation date
7/6/2023 3:09:21 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
6/20/2023
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Victoria Street Roadway & Trail Conceptual Design Study | Study Report - DRAFT | PAGE 56 <br /> <br />Future Geometric Improvements <br />In the process of documenting existing conditions and developing the preliminary concepts, the project <br />team identified several areas of the corridor where the existing roadway geometry may warrant additional <br />investigation and modification as part of a future corridor reconstruction project. These areas are shown <br />in Figure 21 and include: <br />• W Owasso Boulevard Intersection: Horizontal curve. <br />• Just north of Millwood Avenue: Vertical curve. <br />• Between W County Road D and Edgewater Avenue: Horizontal curve. <br /> <br />VI. Planning Level Cost Estimates <br />Planning level cost estimates were developed for both of the ‘full concepts’ presented in Section III of the <br />report – one with a trail on the west side, and one with a trail on the east side. The estimates for the two <br />concepts are very similar. The planning level cost estimate for constructing either a trail on the west side <br />of Victoria Street or the east side of Victoria Street is approximately $3M in current dollars. For more <br />detailed information on the planning level cost estimates, including line-item costs for various items, see <br />Attachment G. <br />Next Steps <br />The study described in this report was completed in July 2022. Based on the concepts that emerged from <br />the study process, Ramsey County, in cooperation with the City of Shoreview and the City of Roseville, <br />intend to seek funding opportunities for the engineering and construction of a Phase 1 project that would <br />consist of constructing a trail along with curb and gutter on one side of Victoria Street. As shown in <br />Figure 22, numerous steps must be completed between planning and construction, including preliminary <br />engineering and environmental analysis, right of way acquisition (if needed) and refinement of the final <br />design. Ramsey County and both cities will continue to seek input from stakeholders as the process for a <br />future trail project on Victoria Street moves forward. <br />Figure 22: Anticipated Project Development Process <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.