My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 07102023
Roseville
>
City Council
>
City Council Meeting Packets
>
2023
>
CCP 07102023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 4:17:04 PM
Creation date
7/14/2023 4:15:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
7/10/2023
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />Date: July10, 2023 <br />Item No.:10.c <br />Department ApprovalCity Manager Approval <br />Item Description:Approve Resolution Awarding Contract for 2023Drainage Improvement <br />Project <br />1 B ACKGROUND <br />2 The 2023Drainage ImprovementProject consists of storm sewer improvements, grading, and <br />3 restoration at fourdifferent locations around the city. The project bid with twoalternatesto include <br />4 two options of installing an updated storm sewer adjacent to Little Lake Johanna. See Attachment B <br />5 forthe 2023 Drainage Improvement Project locationmap. <br />6 The drainage improvement projectprovidesmaintenance and infrastructure updates to the city’s storm <br />7 sewer system to relieve drainage and flooding concerns andadd water quality components to help <br />8 protect our water resources. Based on past practice, the City Council has awarded the contract to the <br />9 lowest responsible bidder. Fourqualified bids were received for the project. Upon review of the bids <br />10 received, Bituminous Roadways, Inc.,is the lowest responsible bidder. The table below summarizes <br />11 bids received: <br />ContractorBase BidAlternate 1Alternate 2Base + Alt 1 <br />Bituminous Roadways, Inc $392,254.00$94,054.50$196,507.00$486,308.50 <br />New Look Contracting, Inc $580,449.00$180,551.00$257,871.00$761,000.00 <br />Meyer Contracting Inc $670,236.29$174,738.27$211,312.52$844,974.56 <br />Forest Lake Contracting$624,595.00$800,000.00$750,000.00$1,424,595.00 <br />Engineers Estimate$350,745.00$94,054.50$196,507.00$444,799.50 <br />12 P OLICY O BJECTIVE <br />13 It is City policy to keep City-owned infrastructure in good operating condition and to keep systems <br />14 operating in a safe condition. <br />15 B UDGET I MPLICATIONS <br />16 Staff received fourbids for this project. The low base bid was submitted byBituminous Roadways, <br />17 Inc., in the amount of $392,254.00. The alternate bid1from Bituminous Roadways,Inc., was <br />18$94,054.50. The overall base plus alternate 1 low bidof $486,308.50was 9% higherthan the estimate <br />19 of $444,799.50. Staff recommendsawarding the base bid plusalternate1. If approved, staff will work <br />20 with Bituminous Roadways, Inc.,to identify items that can be removed, orhow thescope can be <br />21 modified, to reduce the bid cost to align more with the engineers estimate. <br />22 This project is proposed to be paid out of the Storm Sewer Utility Fund. <br />23 This project is proposed to be completed by November 30, 2023. <br />Page 1of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.