<br /> <br />the project aggregate base/subgrade, all concrete and bituminous work shall cease for the <br />construction year. No bituminous base paving or concrete pouring will be allowed after November <br />1st of the calendar year, unless approved by the City Engineer, and if permitted such work shall <br />comply with City specifications. <br />2.11 Construction Hours; Noise; Dust. Developer will comply with all requirements of the City <br />pertaining to the hours and days during which construction activities may take place. Unless a <br />variance is approved by the City Council, construction hours shall be 7:00 a.m. to 9:00 p.m. <br />Monday through Friday and 9:00 a.m. to 9:00 p.m. on weekends. <br />2.12 Street Signs, Lighting, and Mailboxes. The Developer shall be financially responsible for <br />the cost of the City to furnish and install street signage per the Approved Plans. If lighting is <br />installed, all costs to install new street lights shall be solely at the cost of the Developer. Developer <br />is required to supply and install cluster mailboxes as approved by the City and for which such <br />placement must be approved by the USPS Postmaster. <br />2.13 Erosion Control. Prior to issuance of the Notice to Proceed, the erosion control plan must <br />be approved and City erosion control permit must be issued. The Developer shall meet all <br />requirements of the City’s Erosion Control Permit and Ordinance including but not limited to the <br />following. <br />a) No construction activity may occur and no building permits will be issued unless <br />the Property is in full compliance with the erosion control requirements. <br />b) Measures shall be installed in compliance with MPCA NPDES permit <br />requirements, if requited. <br />c) The City shall inspect the site periodically and determine whether it is necessary to <br />take additional measures to address erosion. <br />d) To remove dirt and debris from streets that has resulted from construction work by <br />the Developer, its agents or assigns, the Developer shall sweep streets within the project <br />area, and adjacent streets if tracking is observed, on a weekly basis or more frequently as <br />directed by the City Engineer until the site is stabilized. The Developer must sweep <br />roadways with a water-discharge broom apparatus. Kick-off brooms shall not be utilized <br />for street sweeping. <br />e) If the development on the Property does not comply with the erosion control plan <br />or supplementary instructions received from the City, the City may, following giving the <br />After 48-hours verbal notice to the Developer (or immediately in the case of an <br />emergency), the City may complete or contract to complete the clean-up and may draw <br />down on the Permit, Project or Construction Escrow described in Section 4.01 to pay such <br />costs. <br />9 <br />RS160\\10\\864844.v1 <br /> <br />