Laserfiche WebLink
Jesse Freihammer <br /> From: Gravel, Phil 1111111111111111111111111 <br /> Sent: Monday, November 6, 2023 5:29 PM <br /> To: Jennifer Lowry;Jesse Freihammer <br /> Subject: County Road B Reconstruction - New 4-way stop at Fulham Street <br /> gg Some people who received this message don't often get email from phil.gravel@stantec.com.Learn why this is important <br /> Caution:This email originated outside our organization; please use caution. <br /> Jennifer and Jesse, <br /> I will not be able to attend the meeting this evening, but I wanted to let you know of my objection to <br /> the proposed 4-way stop at Fulham being considered as part of the 2024 County Road B project. <br /> I don't see how the intersection can meet warrants for a 4-way stop. <br /> I think that installing a 4-way stop there would be more dangerous to pedestrian and vehicle traffic. I <br /> also think that a 4-way stop will result in more noise and pollution. <br /> Please reconsider the idea of installing the 4-way stop at Fulham during your final design process. <br /> Other than the 4-way stop, I really like the layout. Good luck. <br /> Phil Gravel <br /> 2176 Fulham Street <br /> i <br />