My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01563
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 3:49:32 PM
Creation date
2/15/2024 3:41:08 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1563
Planning Files - Type
Variance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPERAMERIC 1240�' TT <br />., BLOOMINGTON, MINNESONNESpTA 55431 <br />DIVISION OF ASHLAND OIL, INC. 612-887-6100 <br />January 18, 1985 <br />Mr. David Drown <br />City of Roseville Planning Dept, <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />Subject: SuperAmerica Store #4210 <br />County Road 8 & Lexington Avenue <br />Roseville, Minnesota <br />Dear Mr. Drown: <br />Building interior will be almost wholely gutted an <br />The north corner of the building will be removed at completely remodeled. <br />a new glazed front installed about 28 feet back, on the <br />the existing northwest corner. Thist an angle of 45° and <br />interior circulation around the pulpIsla open the drivewaygsoagoodrom <br />P islands is achieved. <br />The following items will be removed: <br />All false work above the existing masonry walls 1 is ab <br />Roofing over walks. ( out 13'-4" high). <br />Storage shed at southeast corner. <br />All mechanical structures on roof except those essential <br />reuseable in the remodelin nt�al to and <br />existing will be reused, If g' We now anticipate that none of the <br />they will be screened in keeping with the nbui units are used, <br />The north, west and that ori;io building appearance. <br />from County Road 8 will be sk �in,,n1edfwith brickeast and <br />stucco <br />readily . Al l e <br />concrete block not screened will be repaired and covered panels. All float stucco. with a sand <br />The new front entrance at the northwest corner will <br />lit canopy with that portion of the cano have a;i interior <br />used as building signage, Py paralleT to the entrance <br />Earth berms will be provided at the south, west and <br />a portion of the <br />east building elevations. <br />The canopy over the pump islands will be constructed <br />on the building exterior. d of material used <br />
The URL can be used to link to this page
Your browser does not support the video tag.