My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01563
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 3:49:32 PM
Creation date
2/15/2024 3:41:08 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1563
Planning Files - Type
Variance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE NUMBER: 1563-84 <br />APPLICANT: Ashland Oil Page 2 <br />Attached also is a series of six reduced drawings indicating the site <br />plan, circulation system, elevations of the structure, a landscape plan, <br />grading plan, and a floor plan of the remodeled building <br />4. The staff has worked extensively with representatives of the Superamerica <br />organization resulting in the development of the site plan submitted. You <br />will note on the first drawing (the Site Plan) that Ashland Oil Company <br />proposes to dedicate an additional 10 feet on County Road B and 16 feet on <br />Lexington Avenue. This is in accordance with City policy regarding <br />dedication upon application for a Special Use Permit for redevelopment of <br />the site. You will note on the drawing that the 10 foot dedication on <br />County Road B is dimensioned as being 16 feet 6 inches. This is obviously <br />a draftsman's error; it should be labeled 10 feet, 0 inches. The <br />dedication along Lexington Avenue is indicated on the drawing as being 16 <br />feet. This should, in fact, be 16 feet, 6 inches. The important point <br />is that the applicant is willing to dedicate the appropriate <br />right-of-way. <br />5. The site plan solution is designed to place the pump islands roughly <br />parallel with the line of sight from the control station inside the store <br />which will be located behind the angled portion of the building. THe key <br />to the site plan solution is, in fact, in the removal and remodeling of <br />the southwest corner of the building so as to achieve this angle of sight <br />and accommodate adequate space for turning movements as illustrated in the <br />second drawing. <br />6. The parking as proposed conforms with ordinance requirements. You will <br />note, however, that on the Site Plan (first drawing) there is an <br />alternate layout for the parking arrangement on the immediate west side <br />of the building. We suggest that this alternate layout is simpler and <br />will work better inasmuch as cars shown parking at an angle will not have <br />to back into the circulation area around the pumps. This condition can <br />be visualized on the second drawings which indicates the "proposed <br />traffic flow1°. This results in a reduction of parking spaces by one but <br />we suggest it will be a better solution. <br />7. The exterior of the building will be totally resurfaced utilizing stack <br />bind brick panels with Aitec stucco panels around the top. <br />8. A landscape plan and grading plan have been submitted, as prepared by <br />David Kirscht, a registered landscape architect. We suggest the <br />landscaping proposed will be appropriate and add to the attractiveness of <br />the site. Mr. Drown has reviewed the grading plan and finds it workable <br />and acceptable. <br />9. The rear yard of the building is on the north side and as you will note <br />the existing structure is approximately five feet from the north property <br />line. The Ordinance requires this rear yard to be 20 feet, and thus a <br />variance will be required to take the building out of the non -conforming <br />class. <br />10 The request then is for approval of the special use permit for operation <br />of a convenience store and service station in the B-3 Zone; and approval <br />of the variance to the required rear yard setback. <br />
The URL can be used to link to this page
Your browser does not support the video tag.