Laserfiche WebLink
PLANNING REPORT <br />DATE: <br />CASE NUMBER: <br />APPLICANT: <br />LOCATION: <br />ACTION REQUESTED: <br />2 November 1988 <br />•m: <br />Barry J. O'Meara <br />West Side <br />Avenue, South <br />(see sketch) <br />of Lexington <br />of Trailer Park <br />Approval of Amended PUD <br />and Preliminary and Final <br />Plat <br />PLANNING CONSIDERATIONS: <br />1. Attached is a copy of a memo (printed on blue paper) <br />outlining the results of our office hours meeting <br />with <br />the epresentatmpany onives March <br />of <br />Barry O'Meara's office and the Union Bank and <br />30, 1988. This memo will outline the background of the current <br />proposal for this site that has been partially develo <br />proceedings ony earswith <br />(The reader may wish to review thatmemo before <br />this report.) <br />2. Following the initial meetings, there were additional <br />n to meetingsthe potential <br />the review of preliminary design ideas 9 <br />development for this site. The end result is an application on the part <br />of Mr. O'Meara for an Amended PUD d its each.Preliminary <br />Plat o <br />develop three additional structures with four <br />is <br />essentially a one level, two to three bedroom single-family <br />ingle- a illy aces have <br />home with <br />an attached two car garage. Mr. O'Meara <br />and determined that this form of multiple housing has aaccomantial market <br />in Roseville for "empty -nesters who desire one-story <br />with facilities similar to a single-family home. <br />Mr. O'Meara informs us that he had a goodmeeting -with the is ea hco rs <br />and that: the response to his proposal was positive. <br />py <br />of a statement from Mr. O'Meara describing his development and <br />reduced copies of the site plans, building plans, grading plans, landscape <br />plan, and preliminary plat. <br />The <br />3. The new buildings have four units n the ch of other three <br />a structu <br />full res <br />two-story <br />anginal building has one unit aVe <br />building. The new buildings are largely one d for additionaly, bedroom <br />with a <br />portion of the half story able to be finished <br />space. The massing of the new structures is somewhat between a <br />two-story building and a one-story building. Thus, it is hoped that the <br />massing will be compatible with the existing two-story building and with <br />the surrounding residences as well. <br />he <br />4. One of the differences between the two projects <br />is be closerhat a theon t rear south <br />lot <br />end of the development, the structures w <br />line of the existing single-family homes fronting on Oakcrest. The <br />