Laserfiche WebLink
RICE CREEK VaaTaSHED DISTRICT <br />SUITE 374, ARDEN PLAZA <br />3585 NORTH LEXINGTCN AVENUE <br />ARDj j HILLS, S, MINNE.WM 55126 <br />FGYJD Permit No. 90-41 <br />cc: City of Roseville <br />J.M.Montgomery,Inc <br />. <br />PERMIT RCWD File <br />Permit Application No. 90-41 Thomas Willmus <br />Issued to; Willmar Properties, 2845 N. Hamlin, Suite 131, Roseville, NN 55113 <br />Location: Northeast quadrant of the intersection of Snelling Avenue and County ' <br />Road C, Roseville. <br />Purpose: Approval of Final Site Drainage Plan for construction of Roseville <br />Cawunity Bank within Lot 4, Block 1, Venture Third Addition, 1.6+ acres. <br />At their meeting on April 25, 1990 the Hoard of Managers of the Rice Creek Watershed <br />District reviewed your permit application and the reeomiendation of the District Ilig <br />iAleer <br />based upon the following exhibits: 1990. <br />1. Permit Application dated March 28, <br />2. Transmittal letter received from G.Dale Hamilton, McCombs -Frank -Roos Associates,Inc., <br />dated April 2, 1990. 12, 1990, last revised <br />3. Site Plan, prepared by Bu�etow &Associates, dated February <br />April 13, 1990. <br />4. RCWD File 87C01. <br />5. RCM File 90-40. <br />6. $750 Cash Surety, received April 17, 1990. dance with the Rules & Regulations and Guide - <br />They found the project as planned to be in accor <br />lines of the District and therefore approved the permit <br />as requested, with the following ad- <br />ditional stipulations: No additional stipulations. <br />NOTE: Failure to implement and maintain the sediment -erosion control and cash cover <br />sestablisurety.lhment <br />measures outlined in the permit ochibits may result in forfeiture y <br />oursuch measures are satisfactorily provter <br />ided, the cash surety notify <br />be <br />Distrrict office with in writing <br />permanent vegetative cover has been established. Please notify <br />when permanent vegetative cover has been established and a final inspection will be made. <br />it is the responsibility of the Permittee to provide all measures necessary to positively <br />contain sediment on the site during cons�tion. This may require the use of erosion <br />control plan. If his reuirement <br />control measures not outlined on the erosion this enot met, <br />if deemed <br />neces- <br />the Permittee may be ordered to provide additional erosion control measures owner to Pro- <br />vide by the District Inspector. it is also the responsibility of the propertysterns Pro <br />vide whatever maintenance is necessary to assure that the stornwater management sY <br />aP- <br />proved as part of this permit will continue to function as originally designed. <br />wn will be conducted at the project site to assure compliance with all <br />A follow+P inspectt. Failurecomply with the foregoing <br />agreements, terms and/or stipulations <br />Permi,oaths Pin violation of chapter 112.89 MSA, a mis- <br />may result in rescission o <br />demeanor. <br />This doputtent is not transferable, and is valid for one (1) year after the date of issuance. <br />and expiration date. If Permi.ttee requires more time to <br />No construction is authorized bey <br />complete construction, a renewal of the Permit will be necessary. Please.contact us at 483-0634 when the project is about to commence so an inspector may view the work in progress. Permittee has paid for 2 inspections: one at project commencement and <br />ional inspection requested or required will be billed at $15/visit. <br />one at completion. Any additrmittee hconsented to 'the foregoing. The enclosed Owner's <br />BY acceptance of this permit, the Pe as . <br />Certification must be forwarded within ten days of project completion <br />Ll <br />Date of Issue; May 24, 1990 - president, Hoard of Managers, <br />Fee Paid:_ $�2.20,via,�Ck. #26169 eraYM,c,- <br />