My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01677
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1600-1699
>
pf_01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 8:55:54 AM
Creation date
2/16/2024 8:48:16 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1677
Planning Files - Type
Special Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 6 <br />WOODS AND PLASTICS <br />06200 - FINISH CARPENTRY <br />malleable iron as specified under Section 05500 - Structural Steel and <br />Miscellaneous Metals. <br />H . Wood S to i rwork : <br />1. Treaded: 2 inch fir, construction grade or 5/4" particle board, with <br />bullnose. <br />2. Risers: No. 3 pine or 3/4" particle board. <br />3. Skirt Boards: 1/ 2" thick P refinished to match legacy doors. <br />. <br />I. Interior wood base window and door extensions and trim: <br />1. Wood base shall be 2-1/4" match embossed Luan Mahogany to p <br />Legacy doors. <br />2, Wood trim shall match the base. <br />3. Wood caps window and door extensions and misc. trim shall be as shown <br />and shall match the base. <br />J. Attic Scuttle: plywood with paint grade pine trim. Construction as <br />detailed. <br />K. Access panels for bathtubs and shower faucets and traps: <br />in a ratment units shall be plywood with wood trim to be <br />1, panels p <br />painted on the job. <br />or unit and <br />2. panels in public areas including party walls between units <br />0680 approvedequal ed <br />corridor shall be 14 x 20 Liegh or <br />steel, with one hour rating. <br />Mechanical Contractor. <br />locations of all panels withb <br />3. Coordinate o <br />oreuse to intended and <br />L. All hardware required to be of proper size and type for <br />sure <br />fastened. ntaliljs�d�otadiphga�vanized <br />for materials to be or nonferrous <br />substantial and positive anchorage. <br />hardware at exterior work. <br />4. INSTALLATION ANO WO RK14ANSHIP <br />itdingtrade cpracti es these <br />A, Work shall be performed in conformance with good <br />manufacture m building <br />ge <br />applicable recommendations of on the drawings. <br />PP specifically indicate of <br />Specifications unless <br />work shall be well fitted and securely fastened in its proper location <br />All wo devices. <br />ther approved fastening <br />with nails, screws or other B. <br />SECTION 06200 - 3 <br />5264 <br />
The URL can be used to link to this page
Your browser does not support the video tag.