My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01677
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1600-1699
>
pf_01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 8:55:54 AM
Creation date
2/16/2024 8:48:16 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1677
Planning Files - Type
Special Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FML, Inc. <br />STS Project 93589 <br />August <br />g st 28, 1985 <br />RECOMMEDATIONS <br />i GENERAL <br />' Based on the Site Planprovided <br />by Pope Associates, <br />P ociates, Inc. it appears <br />that most of the proposed townhomes will be located on the <br />' half of the site, in the area of natural soils. eastern <br />plexes are to be located near the north end of Two of the four - <br />Because the earthwork and site the fill area. <br />j� preparations for foundation con- <br />struction, utility placement and bituminous <br />�1 pavement design are <br />considerably different for the filled and natural soil areas, <br />specific recommendations for site preparation will be addressed <br />separately for these two areas. <br />NATURAL SOIL AREAS <br />1.1 <br />1. Earthwork <br />We reco <br />mmend that any surficial topsoil and/or the organic root mat <br />be stripped from the building and pavement development f ar estimate treat this w' eas. We <br />ill require stripping to a depth of approxi- <br />mately 6 inches over most of the area. Existing trees and bus <br />should be cleared and rubbed bushes <br />9 to remove <br />system. We recommend that P11 strippingo e the majority of the root <br />�] an experienced S:'a Engineer or operations be observed by <br />Technician to <br />observe <br />the organic root mat and determine the suitabilitythe removal of <br />j soils for placement of fill or foundations. °f underlying <br />Borings within the natural soil area indicate that the w surf � soils are relatively loose ica.al <br />Y se as determined by Standard Penetration <br />testing. These loose soils extend to a depth of approximately <br />� PP ately 1.5 <br />to 4 ft below the ground surface at the <br />boring locations. The low <br />Standard Penetration blow counts encountered in these surfici <br />soils indicate that in their a1 <br />present condition these materials are <br />not suitable for support of building foundations. We recommend <br />that building foundations be based at a depth below this zo <br />ne of <br />
The URL can be used to link to this page
Your browser does not support the video tag.