Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I ?Yi.'tP <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ti ?; ~Q 15 tJ <br />'Ihe total devel~ will also in:::lude up to 4>;-l-2O parJd.n;J spaces, ~ of <br />which are the addition for which the permit nrxlification is beirg sought. <br /> <br />'!he pI"q)OSerl site plan is shc:Mn on Figure 3. 'Ihe site plan shows the <br />vehicular access locations, the parki.rg lot arrl the location an:i size of the <br />build.inJs. In addition to the density d1an:Jes ooted above, the IOOdified site <br />plan shews a reduction in site a~ driveways from four to three. <br />Analysis of the site driveways arrl their design irrlicates that they are <br />adequate to serve the expected traffic volumes. 'Ihe reduction in the number <br />of driveways will be a positive ixpact with respect to the operation of <br />Clevelarrl Avenue. A secorrl iDpJrtant d1arge of rote for air quality arrl <br />traffic cxnsiderations is the overall shift in density. '!he entire net <br />increase in density will ooaJr in the scut.herly one-third of the site. <br />Proposed square footages in that area, will double aver the 1986 permit. <br />Square footages on the rema.in:inJ twc-thirds of the site will be reduced by <br />about seven percent fran the 1986 site plan. <br /> <br />Construction of the pennitted project cxt1I'I'eJ1CE!d in the spri.n:J of 1986. <br />CaI'rpletion of the DDlified centre Points Business Park is planned for 1994 <br />with full occupa.n::y (90 percent) expected in 1995. <br /> <br />'!he normal \VOrk1.n; boors of the Centre Pointe Business Park except for the <br />hotel will be: 8:00 A.M. to 5:00 P.M., Iok:n:iay through Friday. 'Ihe hotel <br />will likely operate 24 haJrs per day. <br /> <br />R:WMAY 1tND '1'RM'PIC VOLUME INFC:IRMM'ICIf <br /> <br />'!his section provides a d;~1SSion of the roadway network within the <br />vicinity of the site an::) references the so.JrOe of the existing am projected <br />traffic vol\I11)2 data utilized in estimatin.J carb:m nnrx>>d.de concentrations. <br />Traffic volumes are cantai.ned in ~ A. <br /> <br />Roadway Network <br /> <br />'Ihe project site is bordered by 1-35W on the "WeSt, Cleve1arrl Avenue on the <br />east, coonty Road D a1 the north an:! the I -35W oo~ ramp tennina1 on <br />the south. 'Ihe prin::ipal access to the regional system is via the <br />i.nterd1arges at Camty Road D and Cleve1arrl Avenue. site acx:ess is provided <br />off of Cleve1an:! Avenue at three stq;> sign controlled intersections as shCM!1 <br />previously on Figure 3. <br /> <br />Cleveland Avenue <br /> <br />Cleve1arrl Avenue is a oollector facility, 52 feet wide arrl striped as four <br />lanes. At the 1-35W ranps, there are no~ arrl sout.h.bourrl left turn <br />lanes in addition to two through lanes in eadl direction. '!his intersection <br />is signalized. <br /> <br />a:nmty Read D <br /> <br />Cotmty Road D is a foor lane, urrlivided facility with signalized ramp <br />te.rmi.na.ls at I-35W. It int.erd1an;Jes with 1-35W via a m:x:lified diarnorrl <br /> <br />7 <br />