Laserfiche WebLink
. ' <br />Does any part of the project ai involve: <br />a. shoreland zoning district? <br />No Yes <br />X Yes' <br />b. delineated 100-year flood plain? <br />No <br />c. state or federally designated river land use district? <br />No Yes <br />Ifyes. identify water body and applicable state classification(s), and describe measures <br />to protect water and related land resources: <br />` <br />19 <br />Describe any physical alteration (e.3., dikes, excavation, fill, stream diversion) of any <br />drainage system, lake, stream, and/or wetland. Describe measures to minimize im. <br />pairment of the water -related resources. Estimate quantity of material to be dredged <br />and indicate where spoils will be deposited. <br />None <br />A% <br />. <br />a.Will the project require an appropriation of ground or surface water? If yes, explain <br />❑X ❑ Yes <br />(indicate quantity and source): <br />No <br />b.Will the project affect groundwater levels in any wells (on or off the site)? If yes, ex- <br />X❑ ❑ <br />plain: <br />No Yes <br />21. <br />Describe the erosion and sedimentation control measures to be used during and after <br />construction of the project. <br />Due to the minimal variation in elevation over the entire site, erosion will <br />be minimal. A siltation fence will bR used in those areas <br />where soils <br />could potentially leave the site and be deposited in storm <br />sewers or onto <br />adjacent properties. <br />22". <br />a. Will the project generate: <br />1. surface and stormwater runoff? <br />No <br />Yes <br />2, sanitary wastewater? <br />No <br />Yes <br />3. industrial wastewater? - <br />No <br />Yes <br />4. cooling water (contact and noncontact)? <br />LXJ <br />No <br />Yes <br />If yes, identify sources, volumes, quality (if other than normal domestic sewage), <br />and treatment methods. Give the basis or methodology of estimates. <br />See Exhibit #8 <br />b. Identify receiving waters. including groundwater, and evaluate the impacts of the <br />discharges listed above. If discharges to groundwater are anticipated, provide per- <br />colation/permeability and other hydrogeological test data, if available. <br />See Exhibit #8 <br />23. Will the project generate (either during or after construction): X <br />a. air pollution? No Yes <br />b. dust? No JL Yes <br />c. noise? No X Yes <br />d. odors? No Yes_ <br />If yes, explain, including -as appropriate: distances to sensitive land uses; expected lev. <br />els and duration of noise; types and quantities of air pollutants from stacks, mobile <br />sources, and fugitive emissions (dust); odor sources; and mitigative measures for any <br />impacts. Give the basis or methodology of estimates. <br />See Exhibit #12 <br />3. <br />