Laserfiche WebLink
system. All truck unloading activity will be inside the <br />building. <br />o Public Water Use. <br />The Facility will use approximately 100,000 gallpns of water <br />per day. This volume can be accommodated by existing capacity <br />of the City water system. <br />o soil Contamination. <br />All surfaces on site on which wastes will move or be stored <br />will be paved and curbed to eliminate potential inadvertent <br />contact with soils. Delivery and shipment areas will be paved, <br />curbed, and protected with spill control equipment. The floor <br />of the Facility will be constructed within a positive <br />containment system for free liquids. Further, an up gradient <br />and down gracient ground water monitoring system will be <br />installed to monitor the groundwater quality beneath the site. <br />o Noise Impact. <br />The Facility will not generate noise aside from that incident <br />to the arrival of approximately 15 to 20 trucks a day. Noise <br />generated by truck traffic will not measurably increase noise <br />within the surrounding industrial area. Construction noise <br />will be short term in duration. <br />o Control of Unauthorized Delivery. <br />Waste contract, site security, and waste stream and shipment <br />control measures will prevent the delivery of unmanifested and <br />uncontracted materials. Federal, state, and county <br />requirements relating to hazardous waste generation, <br />identification, and disposal will also prevent the shipment of <br />unauthorized wastes to the Facility. If uncontracted delivery <br />is attempted, the material will be rejected. <br />o Liability. <br />Potential liability from Facility operations will be covered by <br />bonding, insurance, and financial assurance mechanisms. <br />Liability coverage imposed by federal, state, and county <br />regulation will apply to the Facility. A performance bond in <br />the amount of $500,000 will be procured and maintained covering <br />Facility operations. General .liability insurance with $5 <br />Million limits will cover industrial accident risks, and <br />environmental impairment liability insurance coverage will be <br />provided for long-term, nonsudden environmental incidents. <br />o Impact on Contiguous Properties. <br />It is not anticipated that the Facility will adversely impact <br />the value or use of contiguous properties. Direct imp&7ts from <br />3. <br />