My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01576
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 3:21:11 PM
Creation date
2/16/2024 3:17:10 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1576
Planning Files - Type
Rezoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
METROPOLITAN RECOVERY CORPORATION <br />July 17, 1985 <br />John Harrington <br />Council Chair <br />Special Assistant <br />Metropolitan council <br />Don Madore, Deputy <br />QualityControl <br />Metropolitan <br />Director <br />Control Commission <br />RE: C;./RF Work Plan <br />assessment of earlier submitted work recortslto'theince <br />This is an as rant and project P <br />7/84 MRC has been submitting submitted in the 7/15/84 <br />MWCC <br />and the WMB. Table 1 is a review current performance <br />dates and achievements compared to <br />Program Compliance Report and work <br />o k Pln(Exhibit 4), <br />Pretreatment 9 ram Stipulation Agreement <br />and in the draft Pretreatment nrificant variations in completion <br />(Attachment C). There are significant id not occur (a <br />interim work activities and in CT/RF completion (about <br />dates of in The project financing d <br />as <br />six months delay). partnership <br />expected in July, 1984. The development and <br />took longer to negotiate and complete, and the WMB <br />agreements delayed bench and <br />This subsequently and application <br />grant awards were delayed. sneering design, process <br />pilot studies, RCRA-Part Bloeal permitting was a longer <br />for IDB financing. Also, legion is changed from 7/86 to 1/87. <br />than anticipated• CT/RF completion <br />dates, which are also <br />Table 2 lists mayor activity comp <br />shown on Table 1 as current dates. ation Penalty Credit <br />This Table 2 schedule is dependeoes nt on Sgenerate enough for site <br />financing. If that source <br />base by 11/15/85, then the constrthisoeVentlandmfundsg <br />purchase redic <br />delayed. We will be able to p <br />available better in September. <br />will confident than ever that the CT/Rnationalr from <br />t� We <br />MRC is more c Inter <br />have a sound business have localepermitsCand a good site•activity <br />We are <br />Buffalo, to m have <br />financed to complete all pre -construction development <br />commitments for private e4 uity match requirements for <br />and have co behind the ven- <br />IDB's from DEED. our customer sandearerfollowing the course <br />tune. We continue to make progress <br />outl4nin the 'Task Force reports. <br />SincL , <br />DaniShuster, President <br />cc: Tom Johnson, WMB <br />Sue Robertson, LCWMRoseville <br />June Demos, Mayor, <br />Steve Reed►PCA <br />
The URL can be used to link to this page
Your browser does not support the video tag.