My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01916
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1900-1999
>
pf_01916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 11:04:40 AM
Creation date
2/16/2024 4:00:49 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1916
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 3, 1990 <br />Mr. Morgan Peat <br />Tanner Development Inc. <br />550 Queen St, E. <br />Suite M-150 <br />Toronto, Ontario Canada <br />Dear Mr. Peat; h inspection of your site <br />x recently <br />completed a walk througcan be <br />which is required before a final certificate 0 are my di <br />occupancy <br />gs anc <br />issued for the center. The following found several <br />reviewed the landscape plan and <br />1. x of the landscape <br />discrepancies. I have attached <br />which must be taken <br />plan indicating the appeared <br />care of. Also, it appeared as though some of the p <br />'f. would not survive• Any Plant materials that die <br />materials <br />must be replaced. <br />There was a condition placed on the app <br />royal by the council <br />2. „ ired additional right of waxy be <br />that stated that the requ <br />dedicated along County Rd. B-2 and Fairview Av�r�=nent <br />discussed this matter with the Engineering Department <br />the have indicated to me that they have not received <br />and Y <br />Copies o f the signed and executed easement torrensn that They <br />cope <br />also indicated that if the property <br />d also need a copy of the owners Certificate of Title. <br />would the council approval stating 11that <br />There was a condition on <br />aving materials used for the pedestrian walkway through <br />the p <br />the shopping Center be continued soutedestriantwalkwayhe lis <br />drive to the pathway." Because the p <br />concrete, a concrete crosswalk should d h e constructed across <br />the service drive to comply <br />condition. <br />l)IUVI; l:O 'r;�'il.l.t; • .� \1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.