Laserfiche WebLink
Page 2 <br />Thomas Ehrlich <br />November 159 1985 <br />The breakdown of items and costs for the two projects follows: <br />SANITARY SEWER PROJECT 84-39 <br />Sub contractor cost, 170 l.f. 8" PVC sewer $ 29720.00 <br />20.00 <br />Sub contractor cost, 1 manhole <br />SUB CONTRACTOR TOTAL $ 49240.00 <br />20% Nova Frost administrative cost 848.00 <br />TOTAL CONTRACTOR COST $ 50088.00 <br />Potential Engineering Cost $ 500.00 <br />(Approvable upon submission of Engineering Expenses) <br />WATERMAIN PROJECT W-84-40 <br />ITEM <br />QUANTITY <br />UNIT PRICE <br />TOTAL AMOUNT <br />12" pipe <br />11 217 <br />$ 20.00 <br />$ 24,340.00 <br />6" pipe <br />360 <br />12.00 <br />4 v20.00 <br />Reducer <br />150 lb. <br />1.00 <br />150.00 <br />510.00 <br />Bends 12" <br />510 lb. <br />1.00 <br />1.00 <br />255.00 <br />Bends 6" <br />255 lb. <br />1 <br />350.00 <br />350.00 <br />6" valve <br />1 <br />800.00 <br />800.00 <br />12" valve <br />12" wet tap <br />1 <br />2,500.00 <br />29500.00 <br />Street repair <br />100 s.y. <br />20.00 <br />2,000.00 <br />3000.00 <br />Tees <br />6 <br />500.00 <br />$ 38 225.00 <br />TOTAL <br />10% conting,t;ncy 39822.00 <br />Sub Total $ 42,047.00 <br />Jacking line under Fairview 14,080.00 <br />TOTAL CONTRACTOR COST $ 46,047.00 <br />Potential Engineering cost 5,000.00 <br />(Approval upon submission of Engineering Expenses) <br />TOTAL APPROVAL PROJECT COSTS $ 519047.00 <br />