Laserfiche WebLink
SOLVENTS & CHEMICALS MINNESOTA SOLVE CALS CORPORATION <br />2340 ROSE PLACE e ROSEVILLE, MINN. 55113 • (612) 636-3311 <br />May 31, 1989 <br />Mr. Rick Jopke <br />Planning and Zoning Administrator <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />Dear Mr. Jopke: <br />n which <br />rts <br />As you and your comm suggested we have revised the site pllan submittedoMayt 8e <br />Minnesota Solvents and Chemicals Corporation building Per letter will generally <br />shown on the plan phases of construction that address les the Committee's <br />198g. We have 16 1999 <br />concerns as indicated in Karl Keels memo dated May plan to submit to your committee <br />explore what each phase will accomplish1 We <br />additional detail at our meeting on June 7, 1989 at 1:15 P.M. and to the Commission at <br />the 7 P.M. Public Hearing. <br />k to be accomplished in each phase we considered the impact of <br />In determining the war asphalt paving would be accomplished after <br />each typeIn addition, all set <br />laba co <br />of construction. For example, p <br />concrete work and other construction <br />th n the city code. At present we P <br />requirements will be observed as to the west of our property. This would allow <br />acquire the 17 foot railroad right-of-way <br />partial use of the gravel loading area referred to in Karl Keels memo. <br />Phase I - To be accomplished in 1989 the building adjacent to the office <br />The parking area and drive on the north side of P We then lan <br />a will be curbed and paved as shown on the site plan (unshaded). <br />p <br />are <br />to landscape the area in front of the butt ing. <br />Phase 11 - To be accomplished in 1990 ads with integral <br />Construction of curbed, iii•Iperviaus concrete truck parking P <br />tainliyent, One pad is located in the northeast <br />i oco nplctcrl paving <br />secondary coil <br />area, (due east of the warehouse) as soon a5 the concrc L <br />the and area between the warehouse and the containlnent pad will <br />and curbing, of Y <br />be accolnplished. <br />heastern <br />A second coil tainlnc;nt pad will be c€�nstrueted at tile construct on corner <br />locations <br />yard (due cast of the new I,)ehydrator). (Details o p <br />will be presented at our Inceting oil June 71 1989). <br />A MILSOLV ` Company <br />PRODUCTS - <br />RfliOE T TE • CENTRAL SOYA <br />fpSTMAN • T'E%ACO CNEMICISG �UNP�S WYAND()AniiOTT LAE3A Ef1YR c:E0ilCilA GULF <br />• ANA <br />MUIlly PROUCln Flan UNIT" CARSANGUS ALLIED CHEtul1C�►L ARCO - 5 VER CHEMICAL C <br />CHEVRON CHEMICAL CHURCH d DWIOiNT • DIAMONDSHAMROCK OR RO •OCCIDENTAL CHE - OLI , PL STI N A CHEMICAL <br />GRAIN PROCES <br />SING •GULF OIL CHEMICALS • MiNNL SOTA CORN PROCESSORS • KER MMcO'EE 'ICI • SONES NAMIIT N <br />LEVER BROS. • LONZA • h1ALLINCKR{)DT M <br />PHILLIPS PETROLEUM • PURAC REICHOLD • SILMAR RESINS - STEPAN STAUFFER• SC <br />