Laserfiche WebLink
JAN 04 '90 11:04 GEN i_RiD1.,1TH/C:EhITER CO. �-1 `r� P.2 <br />G. L. CONTRACTING, INC. y <br />P.O. BOX 340 'W 1142) W. 47th ST. <br />HOPKINS, MN 55343 MTKA., MN 55343 <br />(612) 935•8645 <br />December 22, 1989 <br />Center Companies <br />Ill 3rd Ave. S. Suite 400 <br />rinneapolis, M. 55401 <br />} <br />Attn: Carl Parrague' <br />Re: 'Temp. Drainage-Daytons Pad <br />The west parking Jot drains to the new Dayton pad area. <br />This requires the following measures to all w pad construction. <br />Phase I: To ,allow construction ;n Phase I area, drainage <br />can be maintained by constructing a temporary <br />berm to direct flow from the west drainage area <br />to MH 105 & 108. <br />There is an existing catch basis in Phase II area that <br />drains the truck dock area that will have t be left in place 3 <br />until Phase II construction starts. <br />Phase II: This area will also need temporary berms to <br />allow runoff to be diverted to T`iti 108 & 119. <br />If you have any further gt:estlons, feel free to call. <br />Sincerely, <br />C. I.. Contracting, Inc. <br />r--n�I.1 51> w*"V <br />7110mas J . Swanson <br />V'rt gyres. <br />