Laserfiche WebLink
Any Existing Grading/Drainage/Erosion Concerns ? <br />NO <br />YES X_ The proposed construction of Autumn Court is so flat_ <br />that water will stand on the street without building <br />catch basins in or near the cal -de -sac. This can be <br />done by extending a storm sewer line from catch basin 2 <br />or catch basin 3. <br />Drainage Facilities <br />Storm Sewer Main <br />Ponding Area <br />Catch Basins <br />Existing <br />To Be Built <br />X <br />X <br />Describe Grading/Drainage/Erosion control plan: See plan in file._____ <br />Any Utility Concerns ? NO YES —X— <br />Utility Facilities Existing To Be Built <br />Water Main X <br />Water Service X <br />Sanitary Sewer ruin X <br />Sanitary Sewer Serv. X <br />Describe Utility Service Pi4*?s: "CourtrmaAlland <br />the$servicessanitary <br />will�abe built <br />er Main <br />to be built in the new proposed Autumn <br />from the new mains._ <br />Any Curb and Gutter to be Removed/Replaced? NO r YES —X— <br />Any Road/Parking Facilities Concerns? NO YES _X— <br />Describe Road/Parking lots to be built: <br />to be built to Roseville standards. <br />Proposed Autumn Street will have <br />