Chris Seigle <br />November 30, 1988 <br />Page 4 <br />It should be not <br />ed that all of the traffic generation analysis was connductedolor <br />the month of September, which is the peak month of enrollment at the p <br />is <br />Busin <br />ess College. This was done in order to provide a worst -case traffic analy- <br />sis. Exhibit 4 shows the month by month enrollment at the college. <br />OFF -SITE TRAFFIC IMPACTS <br />The traffic impacts of the project were considered at the following intersec- <br />tions: <br />o Lexington Avenue/Project Access Driveway <br />o Lexington Avenue/TH 36 Westbound Ramps <br />o Lexington Avenue/TH <br />36 Eastbound Ramps <br />The critical period for the evaluation of traffic conditions is the <br />P peak <br />hour, yp <br />t ically occurring from 4:30 PM to 5:30 PM. Existing traffic ions listed above <br />unts <br />(October 1988) were conducted by BRWaimeach <br />oofttheiproject were evaluated by <br />ntersec <br />during the PM peak hour. The traffic <br />pacts <br />adding existing traffic to traffic which would be generated at the project site. <br />The determination of project traffic impacts included an assumption that traffic <br />generated at the project site would be oriented as follow <br />0 10 percent to/from Lexington Avenueom TH 36 east of northof Grandview <br />o �3 percent o 37 percent <br />to/fi m TH 36 west of Lexington <br />0 10 percent to/from Lexington south of TH 36 <br />This direction orientation was based on the existint travel origins <br />summaryiof�thisresi- <br />dence locations) of Minneapolis Busin <br />ess College students <br />information, which was provided by the Minneapolis Business College, is shown in <br />Exhibit. 5. <br />The operations of the signalized intersections at Lexington Avenue <br />ena dof theinterTH 6 <br />ramps were evaluated using toe planning <br />method <br />for <br />Thentabl a bet ow summarize_; v��e <br />sections from the 1985 Highway Manua. <br />ntersections: <br />impact of the project's traffic on these two i <br />% of Capacity Utilized (4:30 to 5:30 PM) <br />Intersection Existing Existing Plus Proie� ct <br />Lexington/TH 36 WB 63% 73% <br />Lexington/TH 36 EB 71% 73x <br />1 <br />