Laserfiche WebLink
C'raA L A) . <br />RICE CREEK WATERSHEI) DISTRICT RCS Permit No. 89-138 <br />SUITE 374, ARDEN PLAZA <br />3585 NORTH LL xnx;roN AvENErE cc: City of Roseville <br />ARDEN HILTS, MINNESOTA 55126 J. M. Montgomery, Inc. <br />PER! SIT RCWD File <br />Permit licati n-I�o- 89-138 DNR Waters--M.Rye <br />Issued to: ank ,, 1225 Josephine Road, Roseville, MN 55113 <br />Location: e Road, Roseville. <br />Purpose: Approval of renewal of RCWD Permit 88-167 (approval of "after -the -fact <br />Shoreline IWrovement for construction of a retaining wall and building - <br />additions riparian' to Lake Josephine) . <br />At their meeting on January 10. 1990 the Board of Managers of the rdce Creek Watershed <br />District reviewed your permit application and the recommendation of the District Engineer <br />based upon the following exhibits: <br />1. Permit Application dated December 1, 1989, received December 7, 1989. <br />2. RCWD File No. 88-167. <br />They found the project as planned to be in accordance with the Rules & Regulations and Guide-' <br />lines of the District and therefore approved the permit as requested, with the following ad- <br />ditional stipulations: No additional stipulations. <br />NOTE: In order to comply with Minnesota DNR shoreland ordinances, this approval is <br />granted with the understanding that the proposed ground level deck will be installed <br />without railings. (Addition of railings would require the deck to conform to setback <br />distances from Josephine Lake.) <br />It is the -^esponsibility of the Permittee to provide all measures necessary to positively <br />contain sediment on the site during construction,.. This may require the use of erosion <br />control measures not outlined on the erosion control plan. If this requirement is not net,, <br />the Permittee may be ordered to provide additional erosion control measures if deemed neces- <br />sary by the District Inspector. It is also the responsibility of the property owner to Pro- <br />vide whatever maintenance is necessary to assure that the stornwater management systems aP <br />proved as part of this permit will continue to function as originally designed. <br />A followup inspection will be conducted at the project site to assure compliance with all <br />agreements, terms and/or stipulations to this Permit. Failure to comply with the foregoing <br />may result in rescission of the Permit, and is in violation of Chapter 112.89 MSA, a mis- <br />demeanor. <br />This document is not transferable, and is valid for one (1) year after the date of issuance. <br />No construction is authorized beyond expiration date. If Pennittee requires core time to <br />complete construction, a renewal of the Earmit will be necessary. <br />Please contact us at 483-0634 when the project is about to commence so an inspector array view <br />the work in progress. Permittee has paid for 2 inspections: one at project eoanneneeMent and <br />one at completion. Any additional inspection requested or required will be billed at $15/visit. <br />By acceptance of this permit,the permittee has consented to the foregoing. The enclosed Owner's <br />Certification must be forwarded within ten days of project completion. <br />Date of Issue: February 20, 1990 <br />Fee p4a d: $1 <br />c <br />