My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01880
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1800-1899
>
pf_01880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 9:58:38 AM
Creation date
2/21/2024 9:58:05 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1880
Planning Files - Type
Division of Land
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� o <br />CITY OF ROSEVTF <br />GENFRAL REQUIREMENTS UPON APPRMn AL <br />Date: PUC, UST 2 19�Q <br />TO: C H g L S <br />BE: Parcel No. <br />Legal Description: <br />Zhe Public Works staff has reviewed your application for <br />that is presently pending before the City Council an or lanning Commission. <br />It has been found that $ -2-6 p5 acO in additional charges will become, due. if: your <br />application is approved the city council. It is our standard procedure to collect these., <br />charges at the time of recording of a legal document or upon application for a building <br />permit, whichever takes place first. These additional charges (see city code ordinances) <br />are collected by the city because a property was not assessed in full at the time of _levy <br />or because of the applicant's action which created a situation of utilizing the property <br />to a higher degree than at the time of levy. The charges calculated are normally based on <br />the rate of assessment prevalent at the time they were levied, plus the accrued, interest <br />from that time to present, at the rate of interest charged at that tire. <br />The following is a breakdown of the charges by type of improvement: <br />IMPROVEMENT LEVIED <br />NO.OF YRS . INT . ORIG . INr . TOTAL CCNSMF�FIS <br />LEVIED TO DATE RATE AMOUNT <br />We have reviewed your application to determine further if any additional easements are <br />required for the proper maintenance or construction of either present or future improve - <br />rents. They are listed below: <br />TYPE OF EASEMENT REQUIRED WIDTH CO Z ErTI'S <br />STREET <br />UTILITIES %r-t t- S"XTAr-- T 6Repasto� <br />OTHER <br />Also, <br />be <br />advised <br />that if your application is approved, permits may be required, not only <br />frcam <br />the <br />City of <br />Roseville, but from one or more of the following agencies: <br />STATE OF MINNESOTA, DISTRICT 9 <br />COUNTY OF RAMSEY <br />MINN. DEPT. OF NATURAL RESOURCES <br />RICE CREEK WATERSHED DISTRICT <br />OTHER: <br />If you have any questions on any of the listed requirements above, please contact the <br />Roseville Engineering Department, 484-3371. <br />
The URL can be used to link to this page
Your browser does not support the video tag.