My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01873
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1800-1899
>
pf_01873
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 10:07:08 AM
Creation date
2/21/2024 10:06:12 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1873
Planning Files - Type
Vacation Right-of-Way
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ROSEVILLE <br />GENERAL REQUIREMENTS UPON APPROVAL <br />Date: 1988 <br />To: o IT-3 �E�1L��,S Planning File No.Vc <br />s <br />Re: Property Identification Number: - 29 - 2'' JZ - Oa <br />Legal Description: Lr,.i �L 'T. 1�, Co►-fl►-x+� �� 6--� <br />The <br />Public Works staff has reviewed your application for �ti►�-"�� e� <br />the City Council and/or Planning Commission. <br />that is presently pending before . <br />3.in additional charges will become due, <br />It has been found that $ b Z S <br />if your application is approved by the city councilecordins ofra5legal ydocument <br />procedure to collect these charges at the time of r g <br />or upon application for a building permit, whichever takes place first. These <br />t because <br />P the <br />additional charges (see city code ordinances) are collected y <br />ro ert was not assessed in full at the time of levy or because fthe <br />higherpli- <br />P P Y <br />cant's action which created a situation of utilizing the property toa <br />on <br />degree than at the time of levy . The charges calculated vied are opluslthe aaccrued <br />g P <br />the rate of assessment prevalent at the time they were levied, <br />interest from that time to present, at the rate of interest charged at that time. <br />The following is a breakdown of the charges by type of improvement: <br />y,R NO . OF YRS . INT. . ORIG . <br />IMPROVEMENT LEVIED TO DATE RATE AMOUNT INT. -V Z11 3( COMMENTS <br />2c I42.So 74.81 <br />S.°w3G 2 0 s °jo I g7. so 9 9.44 285.94 <br />ion to determine further if <br />additional <br />We have reviewed your applicatstructionof either <br />easements are required for the proper maintenance or con <br />present or future improvements. They are listed below: <br />COMMENTS <br />TYPL OF EASEMENT <br />REQUIRED WIDTH <br />STREET <br />UTILITIES <br />OTHER <br />Also, be advised that if your application is approved, permits may be required, not <br />only from the City of Roseville, but from one or more of the following agencies: <br />STATE OF MINNESOTA, DISTRICT 9 <br />COUNTY OF RAMSEY <br />MINN. DEPT. OF NATURAL RESOURCES <br />WATERSHED DISTRICT <br />OTHER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.