My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01831
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1800-1899
>
pf_01831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 11:09:28 AM
Creation date
2/21/2024 11:07:33 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1831
Planning Files - Type
Planning-Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Companies <br />SUBURBAN ENGINEERINGq WC. <br />Civil, MunIcipal & Environmental Engineering • Land surveying • Lond Planning • Soil ]cSfing <br />April 13, 1988 <br />Mr. Steve Woods <br />E.A. Hickok & Associates <br />545 Indian Mound <br />Wayzata, MN 55391 <br />RE: Investors Savings Bank Si.te Plan <br />Fine Associates, Venture Addition <br />Roseville, MN <br />Dear Mr. Woods: <br />Enclosed are two (2) copies each of supportive calculations, <br />grading plans and erosion control plans for the above ret'ezcnced <br />project. <br />The grading plan for the proposed bank development shows all <br />drainage flowing in a northeasterly direction to the proposed <br />0.59 ac-ft storage pond. Intermediate drainage calculations <br />indicate a required storage volume of .15 ac-ft is necessaryupon <br />completion of the Dank site. <br />The existing pond had been enlarged during construction of the <br />Slumberland Site. Survey topographic computations show a pond <br />size of, 0.61 ac-f t existing to date. <br />With the bank properl-.y in a developed condition, all storm runoff <br />will be directed into the proposed storage facility. <br />Intermediate drainage calculations clearly indicate adequate <br />storage capacity. Therefore, the proposed Investors Savings Bank <br />site plan conforms to the overall comprehensive plan, permit # <br />78-159. <br />
The URL can be used to link to this page
Your browser does not support the video tag.