My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01723
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1700-1799
>
pf_01723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:32:07 PM
Creation date
2/21/2024 1:31:37 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1723
Planning Files - Type
Planning-Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />ROSEWOOD PROPERTIES, INC. PAGE 3 <br />building in 1990. We suggest that the preliminary plat and the planned <br />unit development be approved subject to adjustment based on the <br />finalization of the right-of-way for this segment of the roadway system. <br />8. A vacation of right-of-way is requested. This involves the existing <br />service road forming the present southeasterly boundary of the site. <br />Given the appropriateness of the design concept, approval of this <br />vacation request is appropriate, subject to the effectuation of required <br />procedures with the Minnesota Department of Transportation. This <br />roadway constructed by MnDOT is a part of the local roadway system. <br />In any case, effectuation of this vacation procedure should begin with <br />the approval of the City Planning Commission and Council. <br />9. In summary, the action requested includes approval of the preliminary <br />plat, planned unit development, vacation of the right-of-way, and <br />variance to parking ratio. Consideration of approval could be considered <br />on the condition of the following items: <br />a. Approval of detailed phasing plan including parking, access, <br />utilities, grading, and landscaping. <br />b. Final review of all engineering details by the engineering staff. <br />C. Review of final grading and landscaping by staff. <br />d. Acquisition of right-of-way for the property to the north. <br />e. Approval as may be required for vacation by MnDOT. <br />f. Finalization of and/or adjustments to final development agreement <br />in conjunction with the planned unit development and tax <br />increment provision. <br />10. It should be noted that the developers and their team of assistants have <br />been extremely cooperative and helpful in working with the City <br />representatives over an extended period of time. It would appear that <br />if the development is accomplished as generally outlined, it will be a <br />highly successful addition to the community in a cruciai area of which <br />the developers and the citizens of Roseville may be proud. <br />
The URL can be used to link to this page
Your browser does not support the video tag.