My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01650
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1600-1699
>
pf_01650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 1:18:35 PM
Creation date
2/21/2024 3:23:08 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1650
Planning Files - Type
Planning-Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota <br />Environmental <br />Quality Board <br />100 Capitol Square Building <br />550 Cedar Street <br />St, Paul, Minnesota 55101 <br />Phone <br />May 28, 1986 <br />Craig Waldron <br />City of Roseville <br />2660 Ciijic Center Drive <br />Roseville, MN 55113 <br />RE: Petition for an Environmental Assessment Worksheet (EAW) for <br />Northwestern College Expansion a Phase II <br />Dear Mr. Waldron: <br />This letter acknowledges receipt of notification that the City of <br />Roseville has considered a petition for an EAW on the above -named <br />project and has determined that an EAW will be prepared. Notice <br />t i e of <br />your decision will be published in the La M2ni= on June <br />6. <br />The procedures to be followed in preparing an EAW are specified in <br />the rules governing the£nviron�ednEal(peaQ��wl4Program, <br />ofspecifically <br />rulesa. <br />sections 6 MCAR 3.027 C., D., a <br />Key points in the procedure include: <br />1. Section 3.027 C.2. provider 25 working days to complete the <br />EAW from the date of your decision on the petition, unless <br />the proposer agrees to more ti=a. The proposer has a <br />responsibility to provide adequate information about the <br />project in a timely manner so that this requirement can be <br />met. <br />2. Copies of the completed EAW must be mailed to all review <br />agencies at the same time as to EQB. These agencies' <br />addresses are giv-wn o;, the EQS "EAW Distribution List". <br />3. A press release contaii:ing the EAW and comment period must be <br />provided to at least one newspaper of general circulation in <br />the area. This must be done within five days of mailing the <br />EAW copies. section 3.027 D.2. gives the required contents <br />of the press release. When preparing the press release <br />81&c:t M (toll -free) to find out the dates of the <br />comment period (since they depend on when the notice of the <br />EAW is published in the = Honit, S)• Note that a paid legal <br />notice is only required if requested and paid for by the <br />proposer. <br />AN EQUAL OPPORTUNITY EMPLOYER <br />4 +►sCi� <br />
The URL can be used to link to this page
Your browser does not support the video tag.