Laserfiche WebLink
2660 CIVIC CENTER DRIVE TELEPHONE 484-337 1 r6sevi <br />Zlo: Lido's planning file <br />From: David P. Drown y IIZg�.neer Assistant Cit �� <br />Re: Rice Creek Watershed District ponding requirements <br />Date: November 27, 1985 <br />eMINNESOTA 55113 <br />Talked with John Panuska with Rice Creek engineers, Hickok and Associates, <br />concerning the district's ponding requirements for the Lido's Development. <br />Based on the precedent established in the past with parcels draining directly <br />to Little Johanna, the district will not be requiring ponding or discharge <br />control but simply skinning facilities to address water quality. <br />With this in mind, elimination of the ditch ponding along the Frontage Road <br />with an appropriate skimming device installed in the manhole should be adequate <br />to meet Rice Creek's needs. Thus, the sidewalk conflict along the front should <br />not be a problem. <br />cc: Charles V. Honchell, Public Works Director <br />