My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01547
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2024 9:14:19 AM
Creation date
2/22/2024 9:02:59 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1547
Planning Files - Type
Zoning Text Amendment
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br />Findings of Fact - page 9 <br />Metropolitan Metals Recovery <br />September, 1983 <br />V. SUMMARY OF ISSUES, INCLUDING ALTERNATIVES <br />A. Air Quality and Noise <br />The amount of air emissions are e facility since water -based expected to be negligible <br />not or 9ligible from the <br />will occur at the facility,organic solvent -based r <br />mine if air The Division of Air Processing <br />quality installation and o Quality will deter - <br />after completion of operating permits are <br />addition the desxg,l specifications for needed <br />air quality surveillance the facility. In <br />and Processing equipment will be monitoring systems of the storage <br />errata) required through RCRA, <br />(EAW, EAW <br />During construction, the contractor must <br />APC-6 and implement dust control measures as with Agency rule <br />airborne fugitive dust. necessary to minimize <br />As such, reentrained All roads within the facility are Paved. <br />to a minimum. traffic will be kept <br />M8C must conform to TSCA <br />re- <br />quirements and will Mitigate noise county and city transportation re - <br />muffled equipment, g noise impacts by the use of <br />effect a uipme t,the routing of truck properly <br />where traffic to avoid an adverse <br />time hours, and conforming Possible, limiting such traffic to day - <br />operational noise at the g the city s truck route system. Facilit <br />minimal due to design requirements. <br />B• Water Quality <br />No adverse impacts to ground or surface water are <br />the facility, expected due to <br />Surface water impacts due <br />since only a secondary to construction activities will be <br />since <br />the myaexistingwarehouse y containment system will be minor <br />at the constructed outside <br />Planned discharge to ground Project site. Moreover, <br />the facilit g and °r surface waters due to there is no <br />Y• The facility will be subject to federalhRCRAeandist tof <br />o <br />requirements for be waste treatment Fnd storage state sgill control and containment 9e facilities for <br />practices, and requirements for design <br />container adequacy and management <br />contairw*nt systems. design and operation of secondary <br />In addition, federal TSCA <br />to the transportation of w ��t and county requirements will apply <br />and wastewater astes associated with the ci <br />requirements for from <br />tefacility <br />cility will co federal <br />an facility <br />dischargeinto fly with federal and MWCC <br />water quality is a the sanitary sewer. No threat to river <br />from combined sanitary an to be posed by possible overflow discharges <br />Of the �' and storm sewers in the area even with e <br />Proposed facility, expansion <br />
The URL can be used to link to this page
Your browser does not support the video tag.