Laserfiche WebLink
b. <br />c. <br />Groundwater quality (on or off the site)? <br />X No Yes <br />Groundwater levels in any wells <br />X No Ye s <br />(on or off the site)? <br />Explain both during and after construction i'ncludin are <br />discharges expected, g y <br />Project site stormwater related to construction activities <br />will be minimal and be directed to existing municipal <br />facilities adjacent to the site. <br />As such, project site <br />surface water quality should not be impacted significant) <br />due to construction activities. y <br />The paved truck parking and unloading area will have storm <br />water drainage facilities which connect to the municipal <br />storm water drainage system. The on -site system will <br />include gates and traps to enable the diversion of surface <br />liquids into internal sumps and control equipment if a <br />waste spill occurs. <br />There is no planned discharge to ground or surface waters <br />due to the operation of the facility. The facility will be <br />subject to federal Resource Conservation and Recover Act <br />(RCRA), state, and county requirements for hazardous waste <br />treatment and storage facilities. <br />The project will comply with federal RCRA and state re- <br />quirements for spill prevention control plans and counter- <br />measures, container adequacy and management practices, and <br />requirements for the design and operation of secondary <br />containment systems. <br />A buried 10400--gallon emergency spill containment earea for <br />truck loading/unloading, a depressed truck dock ara with <br />spill containment in excess of 10,000 gallons, and a <br />containment system for the waste storage area are proposed <br />to be constructed to hold spills and leaks. With regard to <br />the storage area, the floor under the storage containers <br />will be impervious to contain leaks and spills and will be <br />adequately sloped and have sufficient capacity to contain <br />the volume of the largest container or 10% of the volume of <br />the containers located in the storage area. It will also <br />contain a sump or collection area to prevent overflow of <br />the containment system. <br />Also proposed is the construction of a paved spill <br />containment dam separating the truck loading/unloading area <br />and employee car parking lot. <br />7. <br />