My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01547
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2024 9:14:19 AM
Creation date
2/22/2024 9:02:59 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1547
Planning Files - Type
Zoning Text Amendment
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�pf`~ 23. Describe and indicate on a site map the provisions to and <br />;.; control erosion and stormwater run-off. Include size a <br />location of any retention basins, and discharge point(s). <br />The portion of the site to be the construction site is <br />relatively flat. The area of greater slope on site will be <br />undisturbed by construction actiies. A such,at no <br />in <br />additional stormwater control other <br />Item 21 to control waste spills, will be implemented for <br />the project. <br />24. Will the project generate: <br />a. Air pollution? _ No Yes <br />b . Dust? No X __. Yes <br />C. Noise? No X Yes <br />d. Odors? X _ No Yes <br />Explain both during and after construction, identify <br />distances to noise sensitive land uses, and quantity and <br />type of air pollutants. <br />a. Process air emissions will not be significant since <br />water -based, not organic solvent-based, <br />processing <br />will occur at the facility. However, <br />emissions control equipment permit may be required <br />for the facility if venting to the outside air <br />to <br />occur or if a boiler is installed which <br />Minnesota rule 7005-0200 - 7005.OZ50 requirements. <br />Determination of the need for an air quality permit <br />will be made after completion of the design <br />specifications for the facility. <br />in addition, air quality surveillance, monitoring wi.11 <br />systems of the storage, and processing equipment <br />be required through RCRA. <br />b. During construction and operation of the <br />proposed <br />facility, the contractor <br />7005.0550proposer <br />implement dust <br />with Minnesota rule <br />control measures as necessary to minimize airborne <br />fugitive dust. <br />All roads within the facility will be <br />paved. As such, reentrained particulate due to truck <br />traffic will be kept to a minimum. <br />c. The proposer must conform to Toxic SubstancesCtrol <br />Act (TSCA), RCRA, county, and citytransportation <br />requirements and will mitigate is impacts ct by0the <br />use of properly muffled equipment, <br />truck traffic to avos�alimitingf such traffic to <br />residents, where posble, <br />9. <br />
The URL can be used to link to this page
Your browser does not support the video tag.