Laserfiche WebLink
,e. Other unique resources (specify)? <br />X No Yes <br />Explain: <br />29. What roads will receive increased traffic? <br />ADT) each road <br />indicate the current average daily traffic <br />increase in ADT contributed by the project.) <br />It is estimated that there will be approximately 15 <br />incoming truck trips per da�a�ets9in�hattthefrom <br />Project <br />attached traffic report. Atchn <br />would have a negligible effect ont traffic even if the <br />inccming volume were to increase t <br />30. Are adequate energy sources and utilities now available to <br />service the project? No X Yes <br />1. <br />If not, what additions ut lit3es will be required? <br />SUMMARY OF ISSUES <br />List the issues as identi_ Pied by *yes" answers above. <br />Discass alternatives and mitigative measures for these <br />issues. <br />21. Surface and ground water quality could be affected <br />with an accidental spill. Eowev+er, federal RC:RA#, <br />state, and county requirements f ohazardous <br />Waste <br />treatment andstorage <br />occurring. ege wi,l, prevent <br />ny <br />adverse impactsfrom <br />1 <br />24.c. ►3oise generated by truck traffic associated with the <br />project will be alleviated by the use off ro to erlyd an <br />muffled equipment, routing <br />ruck aind limiting such <br />adverse effect on residents? <br />traffic to daytime hours. <br />Facility operational nowillabetmin3t.malkddeck® design <br />loading/unloading area <br />requirements. <br />24.b. gugitive dust emissions due <br />tfathe <br />operatty ion <br />or <br />construction of the proposed <br />mitigated to assure coinlandcaround thefacility Minnesota <br />are <br />7005.0550. All roads <br />paved. <br />_l2. <br />