Laserfiche WebLink
b. Groundwater quality (on or off the site)? <br />_X No Yes <br />C. Groundwater levels in any wells (on or off the site)? <br />X No Yes <br />Explain both during and after construction including any <br />discharges expected. <br />Project site stormwater related to construction <br />ouctionactivities <br />ist <br />will be minimal and be directed to existing <br />ct site <br />cipal <br />facilities adjacent to the site. As such, project <br />j <br />surface water quality should not be impacted significantly <br />due to construction activities. <br />The paved truck parking and ilnloadingr a illto them pal have <br />storm <br />water drainage facilities which connect <br />storm water drainage system. <br />The on -site system will <br />include gates and traps to enable th�odiersionofisurface <br />liquids into internal sumps and contequipment <br />waste spill occurs. <br />There is no planned discharge to groundor <br />surface <br />facilitywaters <br />willbe <br />due to the operation of the facility. <br />subject to federal Resource Conservation <br />forand <br />Recovery <br />zardouswActe <br />(RCRA), stater and county requirements <br />treatment and storage facilities. <br />The project will comply with federal RCRA and state re- <br />quirements for spill prevention control plans <br />ad countr- <br />measures, container adequacy and management <br />requirements for the design and operation of secondary <br />containment systems. <br />spill containment area for <br />A buried 10,000-gallon emergency <br />truck dock area with <br />truck loading/unloading, <br />spill containment in excess of 10,000agallons,aand <br />proposed <br />containment system for the waste <br />With regard to <br />to be constructed to hold <br />oorPunderlls and <br />theleaks. <br />storage containers <br />the storage area, the floor an <br />will be impervious to contain leaks and spills <br />todc <br />containerorl0$ oontainwill e <br />adequately sloped and have <br />sufficient <br />capacity <br />the volume of <br />the volume of the largest It will also <br />the containers located <br />contain a sump or collectiin on area rtoeprevent overflow of <br />the containment system. <br />Also proposed is the construction of <br />paved spill <br />containment dam separating the truck loading/unloading area <br />and employee car parking lot. <br />7. <br />