Laserfiche WebLink
daytime hours, and conforming to the cit 's tr <br />uc <br />route system. Facility operational noise at thek <br />truck dock loading/unloading area will be mini <br />to design requirements. mal due <br />25. Describe the type and amount of solid was <br />hazardous waste that will be to and/or <br />location of disposal. generated and the method and <br />The facility will process incoming wastes not amenable <br />recovery into either inert solid residuals or mixed metal <br />Sludges. In the event that these wastes are <br />fixed solids, approximately 800 tons of solidsrinethed into <br />Of inert blocks composed of cement and other fixationthe form <br />substances combined with trace amounts of mixed metal <br />be generated annually as a s will <br />alternative, if these wastesare <br />residual. In the <br />Processed into sludges, <br />approximately 400 tons of Partially dewatered mixed metal <br />sludges will be <br />generated annually as a process residual. <br />Solid inert substances generated will be disposed <br />at <br />approved sanitary landfills in Minnesota. MixedmetalPCA <br />sludges will be disposed at approved <br />facilities located in other states hazardous waste <br />Al2.5 in Attachment 6 for a description eof abro.e� page <br />quantities for primary users of the proposed facility.waste <br />The facility will also serve as a co <br />small quantities of organic wastes. 1Theseowastesiwi for <br />combined with like wastes destined for similar final11 be <br />treatment or disposal, and shipped <br />quantities to hazardous waste disposalfacilitiestruck. <br />load <br />capacity will assist small and intermediate quantityThis <br />generators which constitute a high percentage of all <br />generators in Minnesota. <br />The drum storage area will be capable of holdin <br />a ma <br />Of 1,500 drums at one time; the expected average beinximum <br />about 100. The storage area floor will be a og <br />,0 <br />ntin <br />concrete pad, elevated in the center and sloping downuons <br />both sides to form two sce-r <br />ate incompatible wastes. Drumswill abe as for handling <br />ou <br />method of final processing indicatedbyy he according to <br />the manifest or bill of lading. The buildingewill thave <br />truck access opening and will be equipped e a <br />showers, fire detectors and extinguishers,wats sprinkler <br />system, two sumps, and other safety features required <br />governmental regulation. q by <br />Wastes brought to the facility will be tested for agreement <br />with manifest descriptio,'i and suitability of the final <br />processing method indicated by the generator on the <br />manifest. Only compatible wastes will be placed in the <br />same area. Partial drums of the same waste material may be <br />10. <br />