My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01547
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1500-1599
>
pf_01547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2024 9:14:19 AM
Creation date
2/22/2024 9:02:59 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1547
Planning Files - Type
Zoning Text Amendment
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A covered mixing tank with mixer is required for the reaction. <br />The auxiliary equipment required consists of aixing tank for <br />the sodium hypochlorite and the sodium hydroxide. <br />The individual shops will have a pretreatment <br />system andthe <br />Facility will require an oxidation react <br />equipment. <br />- . And S1ud4e Thickening <br />Soluble metal salts occur in plating bath dumpnexch <br />thine bath <br />dum;;s, metal finishing rinse tt®sbend the aemovedofrom thegaqueous <br />regenerant solutions. In order <br />solutions the metal salt® must be converted insoluble <br />hydroxides or sulfides. sulfide precipitation This <br />metal from the wastewater than hydrox=emprecipitation. <br />ovete hibulk oof a metal <br />is why a two step process is used to <br />from solution as a hydroxide and then polishing <br />the <br />soluion as <br />with a sulfide precipitation step. Hydr Pr <br />a processt has a greater product flexibility and <br />precipitation. <br />discharge pretreatment requirements t <br />For these reasons hydroxide was chosen as theprecipitator <br />inor <br />the Facility. Metal hydroxide sludges can be <br />redissolvedacids and converted to more soluble formebecauaesof thefor reue. idanger <br />cannot be done with metal sulfide sludges <br />generated. Also. the <br />of toxic hydrogen sulfide gas being ge <br />re uired treatn�nnt of wastewaters from hydroe reemovalio ftexcess <br />q <br />is a simple neutralization with an quire airstripping which is <br />sulfide from the waste <br />much more complicated and expensive. <br />The choice of base to add to the metal solution ution is a imoortan <br />factor affecting both the technical <br />alcium hydroxide and sodium <br />Of <br />the systemCall ium ecommonlyrused. <br />hydroxide are <br />The precipitation of these metalhydroxides equireistn ot ensure an <br />instantaneous so proper equipment <br />adequate retention time for the settlingrmefrom s to metal hydroxide <br />T <br />precipitation must e <br />thickening of the s�lsQebeofacalitated by the equipment. Two <br />standard circular clarifiers with rotating scrapers will be <br />utilized by the Facility. <br />flocculant will most likely be added to the claiferto aid The <br />in a <br />more complete Precipitation of the metalhydroxides. <br />most common flocculants are ferric ohloridea alum and a variety <br />of water soluble polymers. <br />A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.