Laserfiche WebLink
12. Is the proposed project inconsistent with any: <br />a. Adopted land use ordinances? <br />X No Yes <br />The project is located in a General Industrial <br />District (I-2) in the City of Roseville. A zoning <br />amendment and special use permit authorizing this <br />specific type of industrial use are necessary. <br />b. - Adopted comprehensive land use plans? <br />X No Yes <br />C. Local, state, or federal resource management plans? <br />X No Yes <br />If yes, explain: <br />13. Describe current and recent past land use and development <br />on and near the site. <br />The site has never been developed. It is the only <br />undeveloped parcel in this area. Nei;hboring industrial <br />activities include: solvent storage and sales, ware- <br />housing, forest products manufacturing, petroleum tank <br />farm, and food processing, all in the I-2 zoned district. <br />14. Approximately what percent of the site is in each of the <br />following categories? (Percentages should total 100% <br />'before and after construction.) <br />Before <br />After <br />Forest/'Wooded <br />0% <br />0% <br />Brush <br />0% <br />0% <br />Grassland <br />0% <br />0% <br />Cropland <br />0% <br />0% <br />Urban vacant <br />100% <br />36% <br />Wetland (types 3-8) <br />0% <br />0% <br />Impervious Surface <br />0% <br />30% <br />Other (Building) <br />0% <br />34% <br />15. Show the type and location of soils on the site map. Give <br />the SCS soil classification types, if known. <br />The Ramsey County Soil Survey classification is 860c, Urban <br />Land -Hayden -Kingsley complex, 3% to 15% slopes. Nearby <br />well logs indicate clay an6 sand and gravel surface, with <br />area characterized by clay to 12 feet. <br />5. <br />