Laserfiche WebLink
b. Groundwater quality (on or off the site)? <br />x No Yes <br />C. Groundwater levels in any <br />wells (on or off the site)? <br />x No Yes <br />Explain both during and after construction including any <br />discharges expected. <br />Project site stormwater related to conuctionicipal activities <br />will be minimal and be directed to existingproject site <br />facilities adjacent to the sinot besimpacted significantly <br />surface water quality should <br />due to construction activities. <br />The aved truck parkirng and unloading trea to thelhave municipalrm <br />P <br />water drainage facilities which connec <br />storm water drainage system. The on -site system will <br />include gates and traps to enable the diversionfisurface <br />liquids into internal sumps and controlequipment <br />waste spill occurs. <br />There is no planned discharge to groundTheurfac tywatelsbe <br />due to the operation of the facility. <br />subject to federal Resource Conservation and RecoverywActe <br />J 'rements fo <br />(RCRA), state, and countyrequl <br />treatment and storage facilities. <br />The project will comply with federal <br />RCRAand state <br />nd re- <br />- <br />measure <br />quirements for spill prevention c plans <br />s container adequacy and management.: practices, and <br />, <br />requirements for the design and operation of sec <br />ondary <br />containment systems. <br />area <br />for <br />A buried 10,000-gallon emaraeprespill containment <br />a <br />truck loading/unloading, <br />spill containment in excess ofte0s�o�agelareatareand <br />proposed <br />containment system for the was <br />With regard to <br />to be constructed to hold rpunderls and <br />theleaks. <br />storage containers <br />the storage area, the flop <br />ill be impervious to contain leaks and spills and will be <br />w to contain <br />adequately sloped and have sufficintorc10�cofythe volume of <br />the volume of the largest container <br />th <br />e containers located in the storage area.It will also <br />contain a sump or collection area to prevent <br />Of <br />the containment system. <br />Also proposed is the construction of a paved spill <br />the truck loading/unloading area <br />am <br />and employee separating <br />7. <br />