Laserfiche WebLink
Mr. Gary Dodge -2- September 6, 1984 <br />VOLUME AND ROUTING CHARACTERISTICS OF TRUCK TRAFFIC GENERATED <br />BY PROPOSED DEVELOPMENT <br />As you have indicated, it is expected that the proposed deve- <br />lopment would generate approximately 100 truck trip ends per <br />day - 50 arriving at the site and 0 departing from the site. <br />Since all the trucks operating to and from the facility would <br />be under contract/lease by your company, you would have <br />control over the routings that would be used. The intent in <br />defining routings to be used is to recommend routes that pre- <br />sently carry a large volume of truck traffic and furthermore <br />to avoid usage of streets with abutting residential use. In <br />this context, the primary routes that will be designated for <br />truck trips approaching the site will be to/from the north on <br />I-35W (about 25 trips per day), to/from the west on I-35W <br />(about 45 trips per day), to/from the south on T.N. 280 <br />(about 15 trips per day), to/from the east on T.N. 36 (about <br />15 trips per day). <br />For trips to/from the north on I -35W the designated routing <br />will be I-35W, south to County Road C. west to Walnut Street, <br />south to Rose Place, and east to the site For trips to/from <br />the west on I -35W the designated routing will be I -35W, east <br />to Industrial Blvd., north to Walnut Street, east-northeast <br />to Rose Place, and east to the site. For trips to/from the <br />east on T.H. 36 the designated routing will be T.N. 36, west <br />to I-35W, north to County Road C. west to Walnut Street, <br />south to Rose Place, and east to the site. For trips to/from <br />the south on T.H. 280 the designated routing will be T.N. <br />280, north to Terminal Road, west to Walnut Street, north to <br />Rose Place, and east to the site. The proposed routings <br />avoid streets with abutting residential use. <br />