Laserfiche WebLink
City of Roseville <br /> ORDINANCE NO. 1661 <br /> AN ORDINANCE AMENDING <br /> TITLE 7, CHAPTER 707 <br /> AMENDING TITLE 7, CHAPTER 707 OF THE ROSEVILLE CITY CODE TO <br /> CLARIFY PERMIT AND RESTORATION REQUIRMENTS <br /> FOR WORK DONE IN THE RIGHT-OF-WAY <br /> THE CITY OF ROSEVILLE ORDAINS: <br /> SECTION 1: Title 7, Section 707.02 of the Roseville City Code is amended to <br /> read as follows: <br /> 707.02: DEFINITIONS: <br /> The following definitions apply in this Chapter. References hereafter to "sections" are, unless <br /> otherwise specified, references to sections in this Chapter. Defined terms remain defined terms <br /> whether or not capitalized. <br /> APPLICANT: Any person requesting permission to excavate or obstruct a right of way. <br /> BUSINESS DISTRICT: That portion of the City lying within and bounded by the following <br /> streets: to be subsequently designated. <br /> CITY: The City of Roseville, Minnesota. For purposes of Section 707.28 of this Chapter, City <br /> means its elected officials, officers, employees and agents. <br /> COLLOCATE or COLLOCATION: To install, mount, maintain, modify, operate, or replace a <br /> small wireless facility on, under, within, or adjacent to an existing wireless support structure or <br /> utility pole that is owned privately, or by the city or other governmental unit. (Ord. 1519, 4 9 <br /> 2-04-8) <br /> DEGRADATION: A decrease in the useful life of the right of way caused by excavation in or <br /> disturbance of the right of way, resulting in the need to reconstruct such right of way earlier than <br /> would be required if the excavation did not occur. <br /> DEGRADATION COST: The cost to achieve a level of restoration as determined by the City at <br /> the time the permit is issued, not to exceed the maximum restoration shown in plates 1 to 13, set <br /> forth in proposed PUC rules parts 7819.9900 to 7819.9950. <br /> DEGRADATION FEE: The estimated fee established at the time of permitting by the City to <br /> recover costs associated with the decrease in the useful life of the right of way caused by the <br /> excavation, and which equals the degradation costs. <br /> DELAY PENALTY: The penalty imposed as a result of unreasonable delays in right-of-way <br /> construction. <br /> 1 <br /> RS 160\1\928687.v2 <br />