Laserfiche WebLink
backhaul facilities, or cables between utility poles or wireless support structures, or not otherwise <br /> immediately adjacent to and directly associated with a specific antenna. (Ord. 1519, 4 9 2018) <br /> WIRELESS SERVICE: any service using licensed or unlicensed wireless spectrum,including the <br /> use of Wi-Fi, whether at a fixed location or by means of a mobile device, that is provided using <br /> wireless facilities. Wireless service does not include services regulated under Title VI of the <br /> Communications Act of 1934 as amended, including cable service. (Ord. 1519, 1 9 2018) <br /> WIRELESS SUPPORT STRUCTURE: a new or existing structure in a right-of-way designed to <br /> support or capable of supporting small wireless facilities, as reasonably determined by the city. <br /> (Ora i 549 n 9 20 4) <br /> SECTION 2: Title 7, Section 707.09 of the Roseville City Code is amended to <br /> read as follows: <br /> 707.09: PERMIT APPLICATIONS: <br /> A. General Requirements: Application for a permit is made to the Director. Right-of-way <br /> permit applications shall contain, and will be considered complete only upon compliance <br /> with the requirements of the following provisions: <br /> 1. Registration with the Director pursuant to this Chapter; <br /> 2. Submission of a completed permit application form, including all required <br /> attachments, and scaled drawings showing the location and area of the proposed <br /> project and the location of all known existing and proposed facilities; <br /> 3. Payment of all money due to the City for: <br /> a. Permit fees, estimated restoration costs and other management costs; <br /> b. Prior obstructions or excavations; <br /> c. Any outstanding fee,penalty,undisputed loss, damage, or expense suffered <br /> by or owed to the City by applicant including those caused by because of <br /> applicant's prior excavations or obstructions of the rights of way or any <br /> emergency actions taken by the City; <br /> d. Franchise or user fees, if applicable. <br /> 4. Payment of disputed amounts due the City by posting security or depositing in an <br /> escrow account an amount equal to at least 110% of the amount owing. <br /> 5. Satisfaction of all outstanding orders issued on similar permits held by or issued to <br /> the applicant. <br /> B. Additional Equipment: When an excavation permit is requested for purposes of installing <br /> additional equipment, and the performance and restoration bond presently existing is <br /> insufficient with respect to the additional equipment, in the sole discretion of the Director, <br /> the posting of an additional performance and restoration bond for the additional equipment <br /> maybe required in accordance with subsection 707.05A of this Chapter.(Ord. 1209, 8 21 <br /> 19983 <br /> 5 <br /> RS 160\1\928687.v2 <br />