My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 03042024
Roseville
>
City Council
>
City Council Meeting Packets
>
2024
>
CCP 03042024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 12:01:42 PM
Creation date
3/20/2024 12:00:16 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
3/4/2024
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street Light Policy <br />Other Cities <br />Stillwater <br />•Petition of 35% or more of the property owners in an existing subdivision, or the council themselves, determine where a <br />lighting system will be installed. Council schedules hearing at which they will consider project. <br />Maple Grove: <br />Wild Rice Festival <br />•Council determines from time to time areas that need operating street light systems. They hold a hearing when a location is <br />selected <br />•At the hearing, the property owners express their opinion and desirability of the proposed project. <br />•The hearing can be skipped if 100% owner approval is achieved. <br />Elk River <br />•Street lighting of a type approved by the city may be required at all intersections and other locations within the subdivision. <br />Eagan <br />•Street light installed and operated by city when Petition achieves 50% or more from property owners in subdivision, or if the <br />council desires.LMC Sustainable City Award <br />Qbhf!78!pg!342 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.