Laserfiche WebLink
Public Works Department <br />Memo <br />To: Michelle Pietrick, Finance Director <br />From: Steve Zweber, Public Works Superintendent-Streets <br />cc: Jesse Freihammer, Public Works Director <br />Date: February 9, 2024 <br />Re: Storm Sewer Structure Repair <br />Staff is requesting approval for structure repair on various storm sewer catch basins, manholes <br />and sanitary manholes. These repairs will lessen deterioration below grade in these structures. <br />Ess Brothers will seal the ring area and joint sections in identified manholes and catch basins <br />from inside of the structure using a urethane material. <br />Quotes received were calculated for 75 structures: <br />Quotes Received <br />Ess Brothers and Sons $49,500.00 Storm Sewer <br />$24,750 Sanitary <br />Total=$74,250.00 <br />Underground Utility Specialties $52,500.00 Storm Sewer <br />$24,250.00 Sanitary Sewer <br />$500.00 Mobilization <br />Total=$82,250.00 <br />ver last Rehab $50,400.00 Storm Sewer <br />E <br />$25,200.00 Sanitary Sewer <br />Total=$75,600.00 <br />The low quote was Ess Brothers and Sons 2024 Storm Sewer structure repairs are funded <br />through general storm sewer replacement/rehabilitation funds which has an overall budget of <br />$400,000.00 <br />2024 Sanitary Sewer structure repairs are funded through general sanitary replacement I&I <br />rehabilitation of $75,000 <br />Qbhf!259!pg!335 <br /> <br />