My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 02262024
Roseville
>
City Council
>
City Council Meeting Packets
>
2024
>
CCP 02262024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 12:41:33 PM
Creation date
3/20/2024 12:40:24 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
2/26/2024
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bench Handout <br /> Item 7.c <br /> 02/26/2024 <br /> <br />187 the applicant. <br />188 B. Additional Equipment: When an excavation permit is requested for purposes of installing <br />189 additional equipment, and the performance and restoration bond presently existing is <br />190 insufficient with respect to the additional equipment, in the sole discretion of the Director, <br />191 the posting of an additional performance and restoration bond for the additional equipment <br />192 may be required in accordance with subsection 707.05A of this Chapter. (Ord. 1209, 8-24- <br />193 1998) <br />194 <br />195 SECTION 3: Title 7, Section 707.12 of the Roseville City Code is amended to <br />196 read as follows: <br />197 707.12: RIGHT-OF-WAY REPAIR AND RESTORATION: <br />198 A. Timing: The work to be done under the excavation permit, and the patching and/or <br />199 restoration of the right of way as required herein, must be completed within the dates <br />200 specified in the permit. The time may be extended by the Public Works Director who may <br />201 increase such time increased by as many days as work could not be done because of <br />202 extraordinary circumstances beyond the control of the permittee, asdetermined by the <br />203 Director, or by as many days that whenwork was prohibited as unseasonal or unreasonable <br />204 under Section 707.15(B) of this Chapter. <br />205 <br />206 B.Patch and Restoration: Permittee shall patch its own work. The City has the right tomay <br />207 choose either to restore the right of way or to require have the permittee restore the right <br />208 of way or to restore the right of way itself. Regardless of which party restores the right of <br />209 way, the permittee is responsible to provide sufficient backfill in the excavated area to <br />210 support the restoration. <br />211 <br />212 1. City Restoration: If the City restores the right-of-way, permittee shall pay the costs <br />213 thereof within 30 days of billingof such restoration together withpermit fee. <br />214 Restoration fees are established annually in the fee schedule. If, during the 36 <br />215 months following such restoration, the pavement settles due to permittee's improper <br />216 backfilling, the permittee shall pay to the City, within 30 days of billing, all costs <br />217 associated with having to correct the defective work.Upon any failure to pay, the <br />218 City shall refund its cost through the restoration bond. <br />219 <br />220 2. Permittee Restoration: If the permittee restores the right of way itself, it shall at the <br />221 time of application for an excavation permit, if the Director determines additional <br />222 security is necessary, post an additional performance and restoration bond in an <br />223 amount determined by the Director to be sufficient to cover the cost of restoration. <br />224 If, and 36 months after completion of the restoration of the right of way, the Public <br />225 Works Director determines that the right of way has been properly restored, the <br />226 surety on the performance and restoration bond posted pursuant to this subsection <br />227 shall be released. During the36 months following such restoration, all costs <br />228 associated with having to correct the defective work shall be funded cost through <br />6 <br />RS160\\1\\928687.v2 <br />Qbhf!71!pg!335 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.