Laserfiche WebLink
2024 Public Works Work Plan <br />Pathways <br />Pathways <br />•New Pathways –0.96 miles <br />•Twin Lakes Trail Phase 2 <br />•Lexington Avenue <br />•Dale Street (MnDOT) <br />•Wagner/Western <br />•Tamarack <br />•Resurfacing –0.38 miles <br />•Owasso Hills Park <br />•St Croix to Fulham <br />Parking Lots <br />•Howard Johnson <br />•Oval <br />Other <br />•Bike Plan <br />•Snelling & CR B Pedestrian Study <br />Qbhf!46!pg!413 <br /> <br />