My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0423_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0423_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2024 9:47:54 AM
Creation date
4/24/2024 9:46:42 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/23/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
126 Mr. Freihammer explained that, as staff is getting feedback on the bike plan, staff <br />127 can use the feedback to follow up with people regarding the bike lanes and how the <br />128 public should interact with them. The City will certainly work with the County as <br />129 well to get as much promotion as possible. Ultimately, there will be the committee, <br />130 but the City will also use the Commission as a whole to review the bike plan and <br />131 the overall goal would be the Commission recommend adoption of a bike plan. <br />132 <br />133 7. Dale Street Update <br />134 Public Works Director Jesse Freihammer gave a presentation on the Dale Street <br />135 Safety Conversion Project. <br />136 <br />137 The Commission asked general questions regarding the crosswalks and lighting. <br />138 <br />139 Member Mueller asked what the impact is to the stormwater system if the road <br />140 keeps breaking down and disintegrating and keeps getting pushed down into the <br />141 storm drains. <br />142 <br />143 Mr. Freihammer explained this is a maintenance issue but, generally, the County, <br />144 when reconstructing roadways, is getting away from bituminous curb. This project <br />145 is not a reconstruct, it is a resurfacing which is why the County is maintaining it <br />146 only. Hopefully, the next time the road is resurfaced it will be a reconstruct and that <br />147 issue will go away. ` <br />148 <br />149 8. Envision Roseville Update <br />150 Public Works Director Jesse Freihammer updated the Commission on the Envision <br />151 Roseville project. <br />152 <br />153 Chair Ficek indicated he is open to however staff wants to proceed with this topic. <br />154 F <br />155 Mr. Freihammer reviewed some of the proposed projects with the Commission. <br />156 <br />157 Member Hodder indicated he was on the advisory group, and he thought it was very <br />158 comprehensive and he was very impressed with the engagement efforts and the <br />159 different stakeholders that were brought into the process. He thought the <br />160 envisioning process was helpful and this was very well done. <br />161 <br />162 Mr. Freihammer continued to update the Commission on the different projects. <br />163 <br />164 Chair Ficek asked what the next steps that come out of this will be and how this <br />165 will be used in the city, what will the outcome be. <br />166 <br />167 Mr. Freihammer reviewed the steps moving forward with the Commission. <br />168 <br />169 Member Hodder thought the safety issues pointed out were interesting, particularly <br />170 around Har Mar. He did drill into that a little more and just how the businesses were <br />171 feeling and other things that caught his attention. <br />Page 4 of 5 <br />Page 7 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.