My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0528_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0528_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2024 2:29:20 PM
Creation date
6/25/2024 2:14:37 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/28/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit issued: November 16, 2020 <br />Permit expires: November 15, 2025 <br />Table 3: <br />New Permittees - Schedule of permit requirements <br />M N R04O000 <br />Page 28 of 28 <br />Permit requirement <br />Schedule <br />Section 10. New Permittee Applicants <br />• Submit Part 1, and Part2 of the permit application as required <br />• Within 18 months of written notification from the <br />by Section 12. <br />Commissioner that the MS4 meets the criteria in Minn. <br />R. 7090.1010, subp. 1.A. or B. and General Permit coverage is <br />required. <br />Section 13. Stormwater Pollution Prevention Program (SWPPP) <br />• Complete all requirements of Sections 14 -23. <br />• Within 36 months of the date General Permit coverage is <br />extended, unless other timelines have been specifically <br />established in the General Permit and identified below; or <br />• Within timelines established by the Commissioner in item 8.3. <br />Section 14. Mapping <br />• Develop a storm sewer system map. <br />• Within 24 months of the date General Permit coverage is <br />extended. <br />Section 18. Illicit Discharge Detection and Elimination <br />• Develop, implement, and enforce an Illicit Discharge Detection <br />• Within 12 months of the date General Permit coverage is <br />and Elimination Program. <br />extended. <br />Section 19. Construction Site Stormwater Runoff Control <br />• Develop, implement, and enforce a Construction Site <br />• Within 12 months of the date General Permit coverage is <br />Stormwater Runoff Control Program. <br />extended. <br />• When the CSW Permit is reissued, revise regulatory <br />• Within 12 months of the issuance date of the CSW Permit <br />mechanism(s), if necessary, to be at least as stringent as the <br />(expected issuance date of the CSW Permit is August 1, 2023). <br />requirements for erosion, sediment, and waste controls <br />described in the CSW Permit. <br />Section 20. Post -Construction Stormwater Management <br />• Develop, implement, and enforce a Post -Construction <br />• Within 24 months of the date General Permit coverage is <br />Stormwater Management program. <br />extended. <br />Section 21. Pollution Prevention/Good Housekeeping for <br />Municipal Operations <br />• Conduct structural storm water BMP inspections. <br />• Each calendar year. <br />• Conduct pond and ouifall inspections. <br />• Prior to the expiration date of the General Permit. <br />Section 22. Discharges to Impaired Waters with a USEPA- <br />Approved TMDL that includes an Applicable WLA <br />• Submit a// information required in item 22.2. <br />• With each annual report. <br />• Meet requirements for applicable WLAs forbacteria, chloride, <br />• Within 12 months of the date General Permit coverage is <br />and temperature in Section 22. <br />extended. <br />Section 23. Alum or Ferric Chloride Phosphorus Treatment <br />Systems (if applicable) <br />• Meet requirements for treatment systems in Section 23. <br />• Within 12 months of the date General Permit coverage is <br />extended. <br />Section 25. Annual SWPPP Assessment, Annual Reporting, and <br />Recordkeeping <br />• Conduct assessment of the SWPPP. <br />• Prior to completion of each annual report. <br />• On o form provided by the Agency, submit an annual report. <br />• By June 30`h of each calendar year. <br />Page 98 of 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.