My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0723_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0723_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 3:32:43 PM
Creation date
7/18/2024 3:30:36 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/23/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />lei <br />Public Works Department <br />Memo <br />To: Public Works Environmental and Transportation Commission Members <br />From: Jennifer Lowry, City Engineer <br />Date: July 18, 2024 <br />Re: Communications Items <br />The following are updates to projects and other activities happening in Roseville since the last <br />commission meeting: <br />Roseville Public Works project updates: <br />o Bike Plan <br />• The survey and map are closed for comments. Consultants are working on the plan to <br />provide a draft for City and public comment this fall. <br />• httys://talkdot.state.mn.us/roseville-bike-plan <br />o McCarron Retaining Wall Replacement <br />• Anticipated completion by Labor Day. <br />o County Road B Reconstruction, west of Cleveland Avenue <br />• Over the next few weeks storm sewer will be done portion of County Road B. <br />• Residents are encouraged to subscribe to the website for ongoing updates. <br />0 2024 PMP <br />• Portions of the PMP in the Midland Hills neighborhood adjacent to the reconstruction <br />project will be done in coordination with the reconstruction. Other streets that are a <br />part of the PMP are complete. <br />o County Road B Reconstruction from Snelling Avenue to Lexington Avenue (Ramsey <br />County) <br />• Road construction and city watermain replacement has begun. <br />0 2024 Sewer Lining Project <br />• Cleaning and lining has begun on the various locations throughout the city. Contractor <br />to notify impacted properties a minimum of 24 hours in advance of lining. <br />0 2024 Pathways Project <br />• Project is currently in design and includes Lexington Avenue, between County <br />Road B and TH 36, the Wagner Street to Western Avenue cul-de-sac connection, and <br />Tamarack Park pathways shown in Attachment 2. The project will be bid later this <br />year and construction may expand into 2025. <br />Page 11 of 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.