My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 07152024
Roseville
>
City Council
>
City Council Meeting Packets
>
2024
>
CCP 07152024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2024 11:57:15 AM
Creation date
8/9/2024 11:57:06 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
7/15/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />104 <br />105 Streetlight Maintenance Fund <br />106 The Streetlight Maintenance fund is programming replacement of street lighting that was previously <br />107 funded through leases with Xcel Entergy. These leases are coming to an end after a 25-year period, <br />108 which means the replacement of these streetlights is now the responsibility of the city. This has <br />109 resulted in increased capital expenses over the next twenty years. For 2025, staff have programmed a <br />110 transfer of $25,000 from the Excess Cash Reserve fund to provide funding. Public works will continue to <br />111 analyze options for potential cost savings and alternative revenue sources in the coming years. Details <br />112 for this fund can be found on Attachment 1, CIP-page 21-22. <br />113 <br />114 Pathway & Parking Lot Fund <br />115 The Pathway & Parking Lot fund requires additional funds, based on the addition of new pathway <br />116 construction to connect the city’s pathway systems. For 2025, staff have programmed a transfer of <br />117$100,000 from the Excess Cash Reserve fund to provide funding. In future years additional levy support <br />118 will be needed. Attachment 1 , CIP – pages 23-24 show the details for this fund <br />119 <br />120 The Capital Improvement needs of the Enterprise funds are programmed into the fees charged in these <br />121 funds. There are two funds that continue to have either short-term or long-term funding issues. <br />122 <br />123 Water Fund <br />124 Since 2020, the City has been working on funding for capital infrastructure needs in the Water fund. In <br />125 2021, the water fund required debt issuance to address funding for capital projects. These projects were <br />126 completed in 2022. In 2023, $500,000 of ARPA funds was programmed into this fund to cover the 2023 <br />127 capital needs. In 2024, the remaining $600,000 in ARPA funds was programmed into this fund to <br />128 address the capital projects in 2024. Public Works staff have re-prioritized the capital infrastructure <br />129 needs over the next few years to better align with available resources. The last utility rate study <br />130 identified that the City would need to issue debt to pay for the capital needs of this fund in 2026 and <br />131 2032. Utility rate increases will cover operations and debt service and a portion of the capital outlay <br />132 costs. Attachment 1, CIP-pages 28 and 29 show the detailed projects as prioritized by public works and <br />133 also reflect the issuance of bonds. <br />134 <br />135 The updated utility rate study will be presented later this fall and staff will continue to annually review <br />136 and monitor this fund to ensure that adequate resources and fund reserves are maintained. <br />137 <br />138 Storm Water Fund <br />139 <br />140 Public Works staff identified significant rehabilitation needs in the Storm Water fund in the 2023 CIP. <br />141 Historically, only major storm assets such as storm water lift stations were fully analyzed and included in <br />142 the CIP. Public Works staff reviewed all storm water assets and identified replacement life cycles and <br />143 costs for each asset. Maintenance costs were identified for each asset per year. The estimates are <br />144 based on industry standards and staff observations. Water Quality Device Rehabilitation covers storm <br />145 ponds, rain gardens, etc. Storm infrastructure rehabilitation covers pipes, catch basins, manholes, and <br />146 outlet structures. Much of the current storm water infrastructure was installed in the 1960’s so those <br />147 assets are at 80% of their expected lifecycle of 75 years. Public works did a prioritization of projects and <br />148 has slowed the pace at which projects will be done so there will be sufficient resources to cover the next <br />149 7 years. Staff will continue to examine alternative funding sources and may consider bonding for larger <br />150 identified projects in the future. Attachment 1, pages 26 and 27 contain details of the various projects <br />151 and current funding. <br />152 <br />153 Funding Strategies <br />154 The City’s asset replacement programs and associated strategies have proven effective and have <br />155 positioned the City to achieve financial sustainability with regard to our capital assets. However, a <br />156 sustainable program requires on-going review and adjustments to our changing needs and costs. <br />157 <br />158 Based on the needs identified in the 2025-2044 CIP, staff recommend the following strategies. <br />Page 4 of 6 <br />Qbhf!37!pg!99 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.