My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 07222024
Roseville
>
City Council
>
City Council Meeting Packets
>
2024
>
CCP 07222024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2024 12:07:57 PM
Creation date
8/9/2024 12:07:12 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
7/22/2024
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 General Requirements for All Collections <br />2.1Service Requirements\[RJ2\] <br />The Contractor shall provide comprehensive recycling services described herein and as described <br />in the proposal. Collection shall occur bi-weekly on the day of the week designated in Exhibit A, <br />“Recycling Zones Map.” \[RT3\] <br />2.2 Collection Vehicle Equipment Requirements <br />All vehicles must be clearly identified on both sides with Contractor’s name and telephone <br />number. In addition, all collection vehicles used in performance of the Contract shall: <br /> Be duly licensed and inspected by the State of Minnesota; <br /> Operate within the weight allowed by federal and Minnesota statutes and local road <br />weight limits; <br /> Be Minnesota Department of Transportation (DOT)-compliant at all times; <br /> Be leak-proof; <br /> Be maintained to operate within acceptable residential neighborhood noise levels; and <br /> Be kept clean and as free from offensive odors as possible. <br />Each Collection vehicle shall be equipped with the following: <br />1. Two-way communications device; <br />2. First aid kit; <br />3. All safety equipment required by federal, State of Minnesota, and local governing <br />bodies, including federal and State (DOTs); <br />4. Universal spill kits, or other appropriate equipment for cleaning up spills and/or <br />leaks; and <br />5. Receptacle for driver’s cigarette or cigar butts, tobacco ashes, and chewing tobacco <br />residue. <br />2.3 Personnel Requirements <br />Contractor shall retain sufficient personnel and equipment to fulfill the requirements and <br />specifications of this Contract. The Contractor will provide a route supervisor to oversee the <br />recycling route drivers servicing the City. The route supervisor will be available to respond to <br />RFP for City of Roseville Recycling Services A-6 <br />RS160\\1\\934842.v1 <br />Qbhf!353!pg!557 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.