My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0827_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0827_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 12:33:45 PM
Creation date
8/28/2024 12:31:50 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/27/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IG5iRNITiL-1 a <br />leNZ-AR <br />Public Works Department <br />Memo <br />To: Public Works Environmental and Transportation Commission Members <br />From: Jennifer Lowry, City Engineer <br />Date: August 20, 2024 <br />Re: Communications Items <br />The following are updates to projects and other activities happening in Roseville since the last <br />commission meeting: <br />Roseville Public Works project updates: <br />o McCarron Retaining Wall Replacement <br />• Construction of the wall is progressing and is expected to be completed mid - <br />September. <br />• South McCarron Blvd is closed from Glenwood Avenue to Woodruff <br />Avenue, but the trail remains open. <br />o County Road B Reconstruction, west of Cleveland Avenue <br />• Removals of curb, impacted driveways, and the existing paved trails is <br />underway. Concrete curbs and driveways will be soon placed on <br />neighboring mill and overlay streets. Excavation and grading of the County <br />Road B road and trail will soon begin. <br />o 2024 PMP <br />• Portions of the PMP in the Midland Hills neighborhood adjacent to the <br />reconstruction project and Midland Grove Road will be done in coordination <br />with the reconstruction. Other streets that are a part of the PMP are <br />complete. <br />o County Road B Reconstruction from Snelling Ave to Lexington Ave (Ramsey <br />County) <br />• Concrete curbs, driveways, and sidewalks are being placed. <br />• Sept 13 - County Road B is anticipated to be closed to through traffic from Albert <br />Street to Lexington Avenue. Albert Street is currently closed for the private <br />development construction. <br />• The overall project is still scheduled for completion by the end of November. <br />0 2024 Sewer Lining Project <br />• Lining of sewer continues in various locations throughout the city. <br />Properties impacted by the lining will be contacted in advance. <br />0 2024 Pathways Project <br />• Project is currently in design and includes Lexington Avenue, between <br />County Road B and TH 36, the Wagner Street to Western Avenue cul-de- <br />Page 8 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.