My WebLink
|
Help
|
About
|
Sign Out
Home
2024_0924_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2024
>
2024_0924_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 11:56:55 AM
Creation date
9/25/2024 11:42:55 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/24/2024
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
decide said question within 60 days following Contract by the arbitrators to serve on the panel. <br />The arbitration panel shall operate in accordance with the Rules of the American Arbitration <br />Association to the extent consistent with this section, and judgment upon the award by the <br />Arbitrator(s) may be entered in any court with jurisdiction thereof. Meanwhile, collection of said <br />recyclable material shall continue, pending outcome of arbitration. <br />4.3 Estimating Materials Composition as Collected <br />The Contractor shall conduct at least one materials composition analysis of the City's recyclables <br />each year to estimate the relative amount by weight of each recyclable commodity by grade. The <br />analysis shall include: <br />Percent by weight of each recyclable commodity by grade as collected from the City. <br />2. Relative change compared to the previous year's composition. <br />Description of the methodology used to calculate the composition, including number of <br />samples, dates weighed, and City route(s) used for sampling. The Contractor shall <br />provide the City with a copy of each analysis. The analysis will be conducted no later <br />than March 31 of each year, and a copy of the analysis will be provided to the City no <br />later than April 30 of each year. Upon request of the City, an agent(s) of the City shall <br />attend the composition study. <br />4.4 Estimating Process Residuals <br />The Contractor shall provide the City a written description of the means to estimate process <br />residuals, as defined in Section 1, Definitions — "Process Residuals," derived from the City's <br />recyclables. This written description shall be reviewed and approved in writing by the City. Thi,, <br />written description shall be updated by the Contractor immediately after any significant changes <br />to the processing facilities used by the Contractor. <br />4.5 Performance Monitoring <br />The City will monitor the performance of the Contractor against goals and performance <br />standards required within this RFP and in the Contract. Substandard performance as determined <br />by the City will constitute non-compliance. If action to correct such substandard performance is <br />not taken by the Contractor within 60 days after being notified by the City, the City will initiate <br />the Contract termination procedures. <br />The City shall have the right, during the term of the Contract, to have a representative on <br />Contractor's premises to monitor the operation of the Contract. Such representative shall only be <br />allowed on Contractor's premises during normal business hours. <br />4.6 End Market Certification <br />The Contractor shall provide by January 31 of each year through the term of the Contract written <br />certification to the City that all recyclable commodities identified are indeed recycled and not <br />RFP for City of Roseville Recycling Services . A-21 <br />RS160\1\934842.vl <br />Page 90 of 185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.